Laserfiche WebLink
City of Everett 01 25 00 - 6 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />01 25 00 - 6 SUBSTITUTION PROCEDURES <br />F. After sixty (60) calendar day period following "Notice To Proceed": Requests for <br />approval of substitute materials will not be considered, except if one or more of the <br />following conditions exists. With their request, the Contractor shall indicate which <br />condition they believe applies. <br />1. UNAVAILABILITY: A substitution is required because the specified item is not <br />available, due to factors beyond the control of the Contractor. <br />2. UNSUITABILITY: Subsequent information or changes disclose inability of the <br />specified item to perform as intended. <br />3. REGULATORY REQUIREMENTS: Final interpretation of code, regulatory <br />requirements, safety requirements, or insurance requirements necessitate a <br />change due to inability of the specified item to conform. <br />4. WARRANTY: Manufacturer or fabricator cannot certify or warrant performance of <br />specified item as required. <br />5. OWNER'S BENEFIT: In the judgment of the Architect/Engineer, acceptance of <br />the proposed substitution is clearly in the Owner's best interest because of cost, <br />quality, or other consideration. In requesting a substitution under this clause, the <br />Contractor shall furnish substantiation of any such reason. <br />G. Substitutions will not be considered if they are indicated or implied on shop drawings or <br />other project data submittals, without proper notice shown on Section 00 63 25. <br />H. WORK-RELATED SUBMITTALS: Contractor's submittal of, and Architect/Engineer's <br />acceptance of, shop drawings, product data or samples which indicate work not <br />complying with requirements of contract documents, does not constitute an acceptable <br />and valid request for, nor approval of, a substitution. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION 01 25 00