Laserfiche WebLink
City of Everett 00 22 13 - 3 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 22 13 - 3 SUPPLEMENTAL INSTRUCTIONS TO BIDDERS <br />C. Appeal of Responsibility Decision. <br />1. If the City determines the Bidder does not meet the bidder responsibility criteria <br />above and is therefore not a responsible bidder, the City will notify the Bidder in <br />writing with the reasons for its determination. If the Bidder disagrees with this <br />determination, the Bidder may appeal to the director of the City department <br />responsible for this Contract (the “Director”) by presenting additional information <br />to the Director in writing within two (2) business days after receipt of the City’s <br />determination. The Director will consider the appeal and any additional <br />information and will issue a decision regarding the appeal. Any protest by Bidder <br />of the Director decision must be in strict conformity to Everett Municipal Code <br />Chapter 3.46, Bid Protest Procedures, which (among other requirements) <br />requires that any protest be filed with the City Clerk no later than the business <br />day prior to the date of City Council proposed award or rejection of all bids. The <br />City will not execute a contract with any other Bidder until two business days <br />after the Bidder determined to be not responsible has received the Director <br />decision or, if a protest is filed under Everett Municipal Code Chapter 3.46, until <br />two business days after the Bidder receives written notice of the City’s final <br />determination of the protest. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION 00 22 13