My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 52 13 - 1 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 52 13 - 1 AGREEMENT FORM <br />SECTION 00 52 13 - AGREEMENT FORM <br />CONTRACT <br />THIS CONTRACT is made and entered into this _____ day of _____________, ____, <br />by and between the City of Everett, Washington, a municipal corporation existing under <br />the laws of the State of Washington (the “City”) and <br />______________________________________, (the “Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants <br />and agrees to furnish all labor, tools, materials, equipment, and supplies required to <br />complete in a workmanlike manner the work, improvements, and/or appurtenances in <br />accordance with the Specifications and Drawings and all other Contract Documents <br />entitled: “Port Gardner Storage Facility – Demolition Package” (the “Project”). <br />1.Contract Documents. The “Contract Documents” are defined in the General <br />Conditions. The Contract Documents are part of this Contract and are hereby <br />incorporated by reference. Terms that are capitalized in a Contract Document but not <br />defined in that Contract Document shall have the meaning defined to them in the other <br />Contract Documents. A copy of the Contract Documents that were posted for the <br />Project on Builder’s Exchange of Washington (www.bxwa.com) as of Bid Opening Date <br />is maintained by the City Clerk’s Office as a single pdf and is available as follows: <br />Link to PDF <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to <br />signing this Contract. City and Contractor agree that this pdf contains all posted <br />Contract Documents as of the Bid Opening Date. City and Contractor further agree that <br />this pdf may contain some other documents (such as Reference Information) that are <br />not Contract Documents. <br />2. Contract Time. Substantial Completion of the Work shall be achieved within One <br />Hundred (140) calendar days after the effective date of the Notice to Proceed. Physical <br />Completion shall be within Thirty (30) calendar days after the actual date of issuance of <br />Substantial Completion.
The URL can be used to link to this page
Your browser does not support the video tag.