My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lincoln Construction, Inc 2/2/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Lincoln Construction, Inc 2/2/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2024 9:27:48 AM
Creation date
2/2/2024 10:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Lincoln Construction, Inc
Approval Date
2/2/2024
Council Approval Date
1/31/2024
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Demolition Project
Tracking Number
0004167
Total Compensation
$3,041,841.87
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Lincoln Construction 10/2/2024 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1084
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 52 13 - 5 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 52 13 - 5 AGREEMENT FORM <br />11.Repair of Damage. The Contractor agrees to repair and replace all property of the <br />City and all property of others damaged by it, its employees, subcontractors, suppliers <br />and agents. <br />12.Pre-Bid Inspection and Risk of Loss. It is understood that the whole of the work <br />under this contract is to be done at the Contractor’s risk and that: (1) prior to submitting <br />its proposal or bid, it became familiar with the conditions of excavation, subsurface, <br />backfill, materials, climatic conditions, location, traffic, and other contingencies that may <br />affect the work and has made its bid or proposal accordingly and (2) that it assumes the <br />responsibility and risk of all loss or damage to materials or work that may arise from any <br />cause whatsoever prior to completion. <br />13.Headings for Convenience Only. The headings in this document are for <br />convenience only, and shall not be used or considered to interpret or construe this <br />document. <br />14.Effective Date/Counterparts/Signature. This Contract is effective as of the date of <br />the last person to sign it, and may be executed in multiple counterparts, each of which <br />shall be deemed an original. This Contract may be signed with AdobeSign, and any <br />such signature is fully binding. <br />[Remainder of Page Intentionally Left Blank]
The URL can be used to link to this page
Your browser does not support the video tag.