City of Everett 00 72 00 - 17 <br />Port Gardner Storage Facility - Demolition Package WO# UP-3525 <br />00 72 00 - 17 GENERAL CONDITIONS <br />If requested by the Contractor, the Owner will arrange meetings with other contractors performing work <br />on behalf of the Owner to plan coordination of construction activities. The Contractor shall inform itself <br />of the planned activities of other contractors and will coordinate its work with the other contractors. <br />Contractor shall notify the Owner of problems, interference or any difficulty with other contractors or <br />workers engaged by the Owner. The Notice shall be sufficiently prompt and specific so as to allow the <br />Owner to mitigate or avoid increased costs, time of performance, damages or injury. Contractor’s failure <br />to provide such Notice in a timely way shall be deemed a waiver and release of any and all Contract <br />Claims relating to, arising out of, or caused by, any alleged interference, difficulty or problem with <br />another contractor or worker engaged by the Owner. <br />5. PROGRESS AND COMPLETION <br />5.1. NOTICE TO PROCEED <br />Following execution of the Contract by the Owner, the Owner or Owner’s Representative will give the <br />Contractor a written Notice to Proceed. Notwithstanding other provisions of the Contract, the Contractor <br />shall not be obligated to perform Work, and the Owner will not be obligated to accept or pay for Work <br />performed by the Contractor or be liable for any Delays, prior to delivery of the Notice to Proceed. The <br />Owner's knowledge of Work being performed prior to delivery of the Notice to Proceed will not obligate <br />the Owner to accept or pay for such Work. Contractor waives any and all Contract Claims for an <br />adjustment of Contract Sum and Contract Time arising out of, or related to, work it performs prior to <br />receipt of the Notice to Proceed. The Owner may issue partial Notices to Proceed. <br />5.2. CONTRACT TIME <br />5.2.1. General <br />TIME IS OF THE ESSENCE IN PERFORMING THE CONTRACT. Failure to complete the <br />Project within the contractually specified time may affect other Projects and Owner activities. Contract <br />Time starts upon the later of the issuance of the Notice to Proceed or a date specified in the Notice to <br />Proceed. The Contractor shall promptly start the Work as soon as possible after the date of the Notice to <br />Proceed and shall prosecute the Work so that the various portions of the Project shall be completed in <br />accordance with the Contract Time period. Contractor shall perform its work at such times and in such <br />ways that the Work is not damaged by weather such as wind, rain, or snow. Contractor shall correct or <br />repair at its sole expense any Work damaged by weather, irrespective of whether such damage is covered <br />by insurance. No portions of the Work where acceptable quality will be affected shall be constructed <br />while unfavorable conditions exist. By bidding on the Project and executing a Contract to perform the <br />Work, Contractor agrees the contractually required completion dates are feasible, reasonable, and <br />achievable for the Contract Sum. Contractor represents that it has considered all factors relevant to its <br />price and achieving the Completion Dates, including, but not limited to, weather, Site access, labor <br />conditions and the availability of materials, supplies and Equipment. Compliance with ARTICLE 10. <br />NOTICE TO OWNER, ARTICLE 12. CONTRACT CLAIMS, and 5.2.2. Construction Schedule <br />are conditions precedent to a request for, consideration of, and grant of, any extension of Contract Time. <br />Failure to request a time extension in the manner and in the time required by this section, and the <br />Specifications referred to herein, constitutes a waiver by the Contractor of any and all entitlement to an <br />extension of time and any adjustment of Contract Sum arising out, or related to, such Delay.