My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1027 LOMBARD AVE 2024-03-01
>
Address Records
>
LOMBARD AVE
>
1027
>
1027 LOMBARD AVE 2024-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 2:34:16 PM
Creation date
2/6/2024 11:53:31 AM
Metadata
Fields
Template:
Address Document
Street Name
LOMBARD AVE
Street Number
1027
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: B2212-025 Description: CONVERT UNFINISHED BASEMENT TO LIVING SPACE <br /> Applied: 12/13/2022 Approved:4/3/2023 Site Address: 1027 LOMBARD AVE <br /> Issued:4/4/2023 Finaled: 10/9/2023 City,State Zip Code: EVERETT,WA 98201-1537 <br /> Status: FINALED Applicant:JAPETH RICHARDS <br /> Parent Permit:W2108-002 Owner: DOUGLAS IAN C&AMBER E <br /> Parent Project: Contractor:SMART BUILDING SERVICES LLC <br /> Details: <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 6/1/2023 6/1/2023 BLDG 08-FRAMING RAKEEB KHAN NOT READY eTRAKiT Inspection Request <br /> Notes: <br /> 5/31/2023 1:45 PM Japheth Richards <br /> 4257425655 <br /> Contact Name:Japheth Richards <br /> Site Address:1027 LOMBARD AVE <br /> Phone:4257425655 <br /> e-Mail:info@smartbuildingservicesllc.com <br /> Contractor called in. Explained all sub permit rough in approvals are required prior to framing inspection.Contractor opted to cancel inspection and will <br /> reschedule when ready.Did not go on site. <br /> 7/10/2023 7/10/2023 BLDG 08-FRAMING RAKEEB KHAN APPROVAL as noted <br /> Notes: <br /> 4257425655 <br /> Contact Name:Japheth Richards <br /> Site Address:1027 LOMBARD AVE <br /> Phone:4257425655 <br /> e-Mail:info@smartbuildingservicesllc.com <br /> Contractor adding nail plate at penetrations above electrical panel. To be verified at firestopping inspection. <br /> BLDG 09-FIRE CORRECTION <br /> 7/10/2023 7/10/2023 STOPPING/BLOCKIN RAKEEB KHAN REQUIRED <br /> G <br /> Notes: <br /> Top plate penetrations require fire proofing. Perimeter all around exterior at top plate.Suggest adding rockwool at top plate in old garage walls.Vertical <br /> fire stopping required at exterior walls every ten feet. <br /> BLDG 09-FIRE <br /> 7/12/2023 E <br /> 2/2023 STOPPING/BLOCKIN RAKEEB KHAN APPROVAL <br /> G <br /> Notes: <br /> I <br /> Printed: Monday,09 October,2023 1 of 2 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.