Laserfiche WebLink
VERETT <br />0 <br />Permit Number: E2203-215 <br />Applied: 3/25/2022 <br />Issued: 3/25/2022 <br />Status: FINALED <br />Parent Permit: B2104-076 <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:3/25/2022 <br />Finaled: 9/8/2023 <br />Description: WIRING FOR FUTURE Bathroom add on off bonus room <br />Site Address: 617 LEGION DR <br />City, State Zip Code: EVERETT, WA 98201 <br />Applicant: PAUL SWEENEY <br />Owner: SWEENEY PAULA MARIE <br />Contractor: OWNER <br />Details: <br />Installing a bathroom/ and inspecting previously unpermitted work in bonus room.**5/20/22: SCOPE ADDED - NEW 200 AMP MAIN <br />BREAKER ELECTRICAL PANEL <br />WIRING FOR FUTURE Bathroom add on off bonus room <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />4/5/2022 <br />4/5/2022 <br />ELEC - SITE <br />STEVE BANKS <br />APPROVAL <br />READINESS CHECK <br />Notes: <br />e-Mail: Paula_Quiroga@hotmail.com <br />(4/5/2022 2:16 PM SKB) <br />Ready to proceed with normal construction removing concrete for new living areas ready for normal inspection process <br />5/25/2022 <br />5/25/2022 <br />ELEC 05-SERVICE <br />STEVE BANKS <br />CORRECTION <br />eTRAKiT Inspection Request <br />REQUIRED <br />Notes: <br />5/24/2022 2:37 PM Paula Sweeney <br />Panel Upgrade (200 amp panel), Grounding/Bonding Upgrade( Upgrade existing grounding and bonding to 2020 NEC requirements and install <br />communication wire bonding bridge), EV Charger Installation (Run dedicated 240V 50A circuit within 3' of panel location. Install electrical box, and EV <br />charging receptacle. Install 50A GFI Breaker) <br />Contact Name: Paula Sweeney <br />Site Address: 617 LEGION DR <br />Phone:4253515943 <br />e-Mail: Paula_Quiroga@hotmail.com <br />(5/25/2022 3:59 PM SKB) <br />Provide access inside the meter for visual inspection. <br />I <br />Printed: Friday, 08 September, 2023 1 of 2 rk <br />SUPERION <br />