Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />5/16/2022 <br />5/16/2022 <br />BLDG 15-OTHER <br />KURT KECK <br />OTHER <br />See notes <br />Notes: <br />5/14/2022 1:14 PM Paula Sweeney <br />Inspection of the dirt removal before adding the gravel and insulation and vapor barrier <br />Contact Name: Kevin McKenzie <br />Site Address: 617 LEGION DR <br />Phone:4254709734 <br />e-Mail: Paula_Quiroga@hotmail.com <br />(5/16/2022 2:11 PM KMK) <br />Next inspection will be underslab insulation <br />BLDG 06- <br />5/17/2022 <br />5/17/2022 ]— <br />UNDERSLAB <br />KURT KECK <br />APPROVAL <br />eTRAKiT Inspection Request <br />INSULATION <br />Notes: <br />5/16/2022 6:57 PM Paula Sweeney <br />Gravel will be laid, followed by the insulation, and then the vapor barrier, and rebar <br />Contact Name: Kevin McKenzie <br />Site Address: 617 LEGION DR <br />Phone:4254709734 <br />e-Mail: Paula_Quiroga@hotmail.com <br />6/13/2022 <br />6/13/2022 <br />BLDG 08-FRAMING <br />KURT KECK <br />NOT READY <br />See notes <br />Notes: <br />6/11/2022 10:48 AM Paula Sweeney <br />Contact Name: Paula Sweeney <br />Site Address: 617 LEGION DR <br />Phone:4253515943 <br />e-Mail: Paula_Quiroga@hotmail.com <br />(6/13/2022 3:23 PM KMK) <br />1. Complete plumbing and mechanical rough in inspections. <br />2. Vent roof <br />3. Fire caulk top plate penetrations <br />Reschedule for framing when above is complete. <br />(Note: framing ok 6/13) <br />6/16/2022 <br />6/16/2022 <br />BLDG 08-FRAMING <br />KURT KECK <br />APPROVAL <br />eTRAKiT Inspection Request <br />Notes: <br />6/15/2022 2:07 PM Paula Sweeney <br />Plumbing and Mechanical rough in completed. Vent roof and fire caulk top plate penetrations completed <br />Contact Name: Paula Sweeney <br />Site Address: 617 LEGION DR <br />Phone:4253515943 <br />e-Mail: Paula_Quiroga@hotmail.com <br />I <br />Printed: Monday, 11 September, 2023 2 of 3 rk <br />SUPERION <br />