Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2206-003 Description: update leaking outdated plumbing and re-route exterior <br /> vent <br /> Applied:6/1/2022 Approved: 6/2/2022 Site Address: 1117 W MUKILTEO BLVD <br /> Issued:6/28/2022 Finaled:4/21/2023 City,State Zip Code: EVERETT,WA 98203 <br /> Status: FINALED Applicant:JORI WINK <br /> Parent Permit: B2205-024 Owner: PYBURN JAKOB GLENN/WINK JORI <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> leaking toilet drain,old plumbing updated, re route venting so it is not external <br /> update leaking outdated plumbing and re-route exterior vent <br /> IN I <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 7/11/2022 7/11/2022 PLUMB 03-ROUGH JASON NO ACCESS <br /> IN MORRISSEY <br /> Notes: <br /> JORI.WINK@GMAIL.COM;JOSEPHWEAVER316@GMAIL.COM <br /> (7/11/2022 10:11 AM 11M) <br /> -No one onsite! <br /> PLUMB 03-ROUGH JASON CORRECTION <br /> 7/15/2022 7/15/2022 IN MORRISSEY REQUIRED eTRAKiT Inspection Request <br /> Notes: <br /> 7/13/2022 1:04 PM JORI WINK <br /> Contact Name:JORI WINK <br /> Site Address:1117 W MUKILTEO BLVD <br /> Phone:2065182586 <br /> e-Mail:JORI.WINK@GMAIL.COM <br /> (7/15/2022 12:41 PM JJM) <br /> jjm changed Inspection Type from PLUMB 01-CONSULTATION to PLUMB 03-ROUGH IN <br /> (7/15/2022 1:23 PM JJM) <br /> Put all drain,waste,and vent on test per UPC sec 712 Testing. <br /> Vent for lav has to take off above the 6"above the flood level of the fixture per UPC 905.3 Vent Pipe Rise. <br /> Need minimum 21"of free space clearance in front of toilet and lav per IRC and UPC sec 402.5 Setting. <br /> Put water distribution system on live test.UPC 609.4 Testing. <br /> Extend plumbing vents above roof minimum 6"per UPC 906.1 Roof Termination <br /> Paint exterior portion of plumbing vent with UV resistant latex paint. <br /> Vents through roof need to be equal to the cross sectional area of the 4"building drain. <br /> Replace non drainage medium turn 90's with drainage fittings where needed.Per UPC sec 9. <br /> Upsize building clean-out to 4". <br /> *** Bring plumbing system up to 2018 UPC code standards. <br /> I <br /> Printed: Friday, 21 April,2023 1 of 2 <br /> SUPERION <br />