Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PERMIT EXTENSION SHEYENNE EXTENSION <br /> 10/11/2022 10/11/2022 (REASON MORTON APPROVED WORK ONGOING <br /> REQUIRED) <br /> Notes: <br /> 4/6/2023 4/6/2023 BLDG 16-FINAL RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 3/22/2023 8:11 PM Barbara McLean <br /> Contact Name:Barbara McLean <br /> Site Address:5103 S 4TH AVE#1-A <br /> Phone:2064883103 <br /> e-Mail:kmdesigner0466@gmail.com <br /> Previous inspector is out. Need framing approval. Need engineer letter per plans.Previous inspector to approve framing when he returns. <br /> 4/11/2023 T 4/11/2023 BLDG 08-FRAMING RAKEEB KHAN RESCHEDULE <br /> ONLINE <br /> Notes: <br /> Barbara McLean <br /> see engineer report added to file <br /> Contact Name:Barbara McLean <br /> Site Address:5103 S 4TH AVE#1-A <br /> Phone:2064883103 <br /> e-Mail:kmdesigner0466@gmail.com <br /> Rescheduled from 4/11 to 4/12/2023. Building inspector out. <br /> 4/14/2023 4/14/2023 BLDG 16-FINAL KURT KECK RESCHEDULE eTRAKiT Inspection Request <br /> ONLINE <br /> Notes: <br /> 4/6/2023 1:55 PM Barbara McLean <br /> field sketch report attached <br /> Contact Name:Barbara McLean <br /> Site Address:5103 S 4TH AVE#1-A <br /> Phone:2064883103 <br /> e-Mail:kmdesigner0466@gmail.com <br /> Your inspection has been rescheduled for Monday April 17th. <br /> 4/19/2023 4/19/2023 BLDG 08-FRAMING KURT KECK APPROVAL per engineers letter att. <br /> Notes: <br /> Phone:2064883103 <br /> e-Mail:kmdesigner0466@gmail.com <br /> 4/19/2023 4/19/2023 BLDG 08-FRAMING KURT KECK APPROVAL per engineers letter att. <br /> Notes: <br /> Barbara McLean <br /> see engineer report added to file <br /> Contact Name:Barbara McLean <br /> Site Address:5103 S 4TH AVE#1-A <br /> Phone:2064883103 <br /> e-Mail:kmdesigner0466@gmail.com <br /> Rescheduled from 4/11 to 4/12.Building inspector is out. <br /> I <br /> Printed:Wednesday, 27 September, 2023 2 of 3 rk <br /> SUPERION <br />