My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7606 BEVERLY BLVD UPSTREAM RECORDS 2024-02-09
>
Address Records
>
BEVERLY BLVD
>
7606
>
UPSTREAM RECORDS
>
7606 BEVERLY BLVD UPSTREAM RECORDS 2024-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 7:55:01 AM
Creation date
2/9/2024 7:54:48 AM
Metadata
Fields
Template:
Address Document
Street Name
BEVERLY BLVD
Street Number
7606
Tenant Name
UPSTREAM RECORDS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intake &Approval Sheet ip(FOR PERMIT STAFF ONLY) di) PERMIT# 322 It-023 <br /> BUILDING 111PLANNING <br /> Intake OK by: Date: Intake OK by: Assign To: Date: <br /> Intake Comments: Intake Comments: <br /> Zone NT6 <br /> Overlay/Agreement❑ � �Route to Commercial Building Nonresidential Use ,QA{ - <br /> ❑ Route to Residential Building Residential Use <br /> ❑ Make this a"W" Permit Proposed No. of Dwelling Units: <br /> Bldg/TI/Ad / eni Si SO D iF Total No. of Dwelling Units: <br /> Garage/Accessory Struct. Size Planning/Landscape Inspection Required before Final? ❑Yes ❑No <br /> Number of Stories / "In Lieu"Fee:Type: Amount$ <br /> Basement g,No ❑Yes , Fin/Unfin School Impact Fee: Total $ <br /> Type of Construction VI,> Calculated: Credit: <br /> Occupancy Group 3 ❑Everett School Dist ❑Mukilteo School Dist <br /> Occupancy Load % Park Impact Fees for permits applied for after 1/1/2022:k)'()'✓ <br /> Fire Sprinklers: ❑Update Existing ❑New System (allot Req'd Park Impact Fee Total$ (net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): <br /> Fire Alarm: ❑Update Existing ❑New Systemot Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: 0 100%Credit-Issued 1/1/2022-9/2/2022 <br /> RCW 64.55 MF worksheet req'd for permit? ❑Yes ,.No 0 50%Credit-Issued 9/3/2022-6/2/2023 <br /> Add'I RCW 64.55 docs required prior to final? ❑Yes PNo 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$Si 3 G f�, yI Additional Notes: ' I) <br /> Approved By ``7 3� I�\1n, �Q Date: ' 12� <br /> v" PUBLIC WORKS 6 <br /> Additional Notes: Intake OK by: ( Date:14 I� Z2 <br /> Intake Comments: PW Worksheet Needed if: <br /> �,� ❑Sys Dev Eval(util/SW)OTraffic Mit Eval <br /> Approved By j,��/G�7 Date:f37-- y/ZbZ 3 ❑Site Work/Drainage DAddress Letter <br /> OBackflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate/Deferred Submittals Required: DRoute this folder for PW Review at end ---PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> ❑This Permit is Approved by Public Works <br /> Fire Dept. Fees: ❑ See PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans- NO FIRE FEE 0 A Separate PW Permit is Required (Permit#: PW ) <br /> ❑ Minimal or No Fire Scope-NO FIRE FEE AND 0 Is located in this folder <br /> AEI-Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By:Y..,.9:){d(NY1 Date: ,_ )--23 ❑ Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> VI Public Works has no scope---PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: 4t Jt 4tfA/vvlQvtii___- al 1.2t, 2 <br /> Approved By: Date: Completely: Date: <br /> �/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.