My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8208 FLORIDA DR 2024-02-28
>
Address Records
>
FLORIDA DR
>
8208
>
8208 FLORIDA DR 2024-02-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 9:30:37 AM
Creation date
2/9/2024 8:43:47 AM
Metadata
Fields
Template:
Address Document
Street Name
FLORIDA DR
Street Number
8208
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 4/18/2022 <br /> City of Everett Permit Services Public Works Permit#: PW2204-014 <br /> 3200 Cedar Street, 2 Floor Associated Bldg Permit#: W2204-012 <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $160.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> NGUYEN IVY NGUYEN IVY <br /> 8208 FLORIDA DR 8208 FLORIDA DR <br /> EVERETT,WA,98203 EVERETT,WA,98203 <br /> PHONE:4252682298 PHONE:4252682298 <br /> TAX PARCEL ID#:00393900501000 SITE ADDRESS:8208 FLORIDA DR <br /> DESCRIPTION: FILL MATERIAL,GRAVEL,AND OTHER HARD SURFACES TO BE REMOVED <br /> FROM THE WETLAND BUFFER. NATIVE PLANS WILL BE INSTALLED. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated 07/25/2022. <br /> Approved plans must remain on job-site at all times. <br /> 5. It is the applicant/contractor's responsibility to ensure coverage under Ecology's Construction Stormwater General Permit is obtained and <br /> maintained throughout the entire construction duration. <br /> 6. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.An Inspection Handout is provided at permit issuance with instructions on how to request an inspection online. This <br /> project will require additional Planning Department Inspections in addition to the Public Works Inspections. <br /> 7. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br /> SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 8. Keep City streets clean at all times. No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 9. Protect all existing underground utilities(to remain)during construction. <br /> 10.All excavated material shall be hauled to an approved,permitted site. <br /> 11. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a haul route will be required to be submitted to <br /> the City of Everett prior to permit issuance.Contact the Traffic Engineering Department for Street Use Permits and any required Oversize <br /> Load Permits at 425-257-8810(press Option 7 for Traffic). <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control........................................$50.00 <br /> Grade/Fill/Excavate(190 CY)...................$70.00 <br /> PW Plan Review.......................................$20.00 <br /> PW Site Inspection...................................$20.00 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> may arise because of installation and maintenance of the <br /> �au�,uya `rex 07/25/2022 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAYBE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> —APPLICANT/JOB SITE COPY _TREASURER ADDRESS FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.