My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
500 47TH ST SE 2024-02-28
>
Address Records
>
47TH ST SE
>
500
>
500 47TH ST SE 2024-02-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 10:52:46 AM
Creation date
2/9/2024 9:35:15 AM
Metadata
Fields
Template:
Address Document
Street Name
47TH ST SE
Street Number
500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 12/5/2022 12/5/2022 PLUMB 03-ROUGH JASON CORRECTION see notes <br /> IN MORRISSEY REQUIRED <br /> Notes: <br /> 12/2/2022 11:13 PM Zachary Wait <br /> Contact Name:Zachary Wait <br /> Site Address:500 47TH ST SE <br /> Phone:5416020783 <br /> e-Mail:zachary.wait@gmail.com <br /> -Finish running plumbing vents through roof for rough inspection.-Install clean outs on kitchen drain and AW drain per the UPC 707.4 Location.- <br /> Kitchen drain cannot wet vent on toilet vent.Wet vent section is under sized and runs horizontally under slab. Per 908.1.1 Size 908.2 Horizontal Wet <br /> Venting for a Bathroom Group.Run separate 2"drain for kitchen sink under slab to downstream of toilet vent connection.-Insulate all water supply <br /> pipe in attic per the UPC. <br /> PLUMB 02- JASON <br /> 12/14/2022 12/14/2022 GROUND MORRISSEY APPROVAL eTRAKiT Inspection Request <br /> WORK/SLAB <br /> Notes: <br /> 12/12/2022 3:53 PM Zachary Wait <br /> ground work/rough in <br /> Contact Name:Zachary Wait <br /> Site Address:500 47TH ST SE <br /> Phone:5416020783 <br /> e-Mail:zachary.wait@gmail.com <br /> 12/14/2022 12/14/2022 PLUMB 03-ROUGH JASON APPROVAL <br /> IN MORRISSEY <br /> Notes: <br /> 2/13/2023 2/13/2023 PLUMB 08-FINAL JASON CORRECTION see notes <br /> MORRISSEY REQUIRED <br /> Notes: <br /> 2/8/2023 3:13 PM Zachary Wait <br /> Contact Name:Zachary Wait <br /> Site Address:500 47TH ST SE <br /> Phone:5416020783 <br /> e-Mail:zachary.wait@gmail.com <br /> -Install air-gap on drain for Diswasher per the UPC 807.3 Domestic Dishwashing MachineNo domestic dishwashing machine shall be directly connected <br /> to a drainage system or food waste disposer without the use of an approved dishwasher air gap fitting on the discharge side of the dishwashing <br /> machine.Listed air gaps shall be installed with the flood-level(FL)marking at or above the flood level of the sink or drainboard,whichever is higher.- <br /> Install hammer arrester on supply to dishwasher per the UPC 609.10 Hammer Arrester Building water supply systems where quick-acting valves are <br /> installed shall be provided with water hammer arrester(s)to absorb high pressures resulting from the quick closing of these valves.Water hammer <br /> arresters shall be approved mechanical devices that comply with ASSE 1010 or PDI-WH 201 and shall be installed as close as possible to quick-acting <br /> valves.-Caulk base of toilet per the UPC 402.2 Joints Where a fixture comes in contact with the wall or floor,the joint between the fixture and the wall <br /> or floor shall be made watertight. <br /> I <br /> Printed:Tuesday,28 February,2023 2 of 3 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.