My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 RIVERSIDE RD AMAZON 2024-05-02
>
Address Records
>
RIVERSIDE RD
>
607
>
AMAZON
>
607 RIVERSIDE RD AMAZON 2024-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2024 8:01:21 AM
Creation date
2/11/2024 11:19:40 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
607
Tenant Name
AMAZON
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LE LOEB <br /> ELECTRIC <br /> Table of Contents: Page(s) <br /> 1.0 Program Overview 3 <br /> 1.1 Program Terms and Definitions 4 <br /> 1.2 General Program Expectations 4 <br /> 1.3 Required Deliverables 11 <br /> 1.4 Deductions and Chargebacks 12 <br /> 1.5 Inconveniences Caused by Others 12 <br /> 1.6 Overall Program Responsibilities and Ownership 12 <br /> 2.0 Preventative Maintenance (PM) 13 <br /> 2.1 PM Scope of Work 13 <br /> 2.2 Comprehensive PM Strategy 14 <br /> 2.3 PM Division of Responsibilities 15 <br /> 2.4 PM Timeline 16 <br /> 3.0 Infrared Window Installation 16 <br /> 3.1 Infrared Window Scope of Work 16 <br /> 3.2 Infrared Window Division of Responsibilities 17 <br /> 3.3 Infrared Window Installation Timeline 17 <br /> 4.0 Arc Flash Relay Installation 17 <br /> 4.1 Arc Flash Relay Scope of Work 17 <br /> 4.2 Arc Flash Relay Specifications and Design 18 <br /> 4.3 Arc Flash Relay Division of Responsibilities 18 <br /> 4.4 Arc Flash Relay Installation Timeline 21 <br /> 5.0 Infrared Scanning 21 <br /> 5.1 Infrared Scanning Scope of Work 21 <br /> 5.2 Infrared Scanning Division of Responsibilities 21 <br /> 5.3 Infrared Scanning Timeline 21 <br /> 6.0 BMS Integration 22 <br /> 6.1 BMS Integration Scope of Work 22 <br /> 6.2 BMS Integration Division of Responsibilities 22 <br /> 6.3 BMS Integration Timeline 22 <br /> 7.0 GSF Critical Load Planning 22 <br /> 7.1 Critical Load Planning 22 <br /> 8.0 UPS Replacement 23 <br /> 8.1 UPS Installation 23 <br /> 1Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.