Laserfiche WebLink
AWAS((((*))) <br />/1M?LIFIED WIRELESS SOLUTIONS, INC <br />Cable and Component Testing <br />Perform and record a sweep test of every cable section using an FDR sweep, by utilizing a 50 ohm load <br />terminator on the end of each cable. <br />Test all sections of cable with 2 connectors at common frequency bands for application (765-855 MHz <br />Etc. to cover 700/800 frequencies) <br />On test results no return loss at any connector along the cable segment shall be greater than 20 db. If <br />more a cable check needs to be done on the run for bends or tears if present replace bad section and re <br />-test cable. <br />General Notes and Procedures <br />1. Plans are not scaled and for outline only, unless otherwise noted. <br />2. Before submission of pre -construction drawings, the site will be visited and confirmed that the work <br />will be completed as presented before construction begins. <br />3. All equipment and materials will be installed in accordance with the manufacturer recommendations <br />unless indicated otherwise or where dictated local codes or regulations are needed. <br />4. All work performed and materials installed shall be in accordance with all applicable codes, <br />regulations and city ordinances, mechanical and electrical systems will be installed in accordance with all <br />city and state municipal and utility company specifications. <br />5. The project manager will supervise and direct the work with great attention to detail. Also be solely <br />responsible for all construction methods, techniques and procedures and for coordinating all portions of <br />the project with the site and landlord's authorized contact. <br />6. All construction shall be in accordance with the City of Everett municipal code and all adopted state <br />codes including addendums specifically set forth by the City of Everett. <br />7. Details are intended to show final result of design. Minor modifications may be required as project is <br />installed. <br />8. As a general rule, the project manager will keep the area clean, hazard free and dispose of garbage <br />properly. <br />9. Penetrations of roof membranes shall be patched/flashed and made watertight to protect the <br />property owner. <br />10. All circuits to be used to power the DAS shall be approved by the electrical engineer for 120V power <br />for the DAS and provide #2 bare copper ground at the head -end equipment location. <br />11. All wall mounted DAS equipment will be securely mounted on 3/4" backboard. <br />12. Attach J hooks to 1/2" cabling at 4' minimum sections when not installed in conduit or in supported <br />raceways. <br />13. Bend radius of 1/2" coax has a minimum of 10" <br />Amplified Wireless Solutions, Inc. <br />6000 NE 881h St., Bldg C, Suite 107 <br />Vancouver, WA 98665 <br />