Laserfiche WebLink
OAXIAL CABLE GROUNDING <br /> S <br /> • ' KEY NOTES. VI H2HOLE COM RESSIONLUTGS °'! <br /> 7O EXISTING UGHTPOLE I STEALTH MONOPOLE (TYP) � <br /> LONG BARREL COMPRESSION LUGS <br /> O NEW VERIZON ANTENNAS. © WITH(2)5/16"BOLTS AND LOCK <br /> y ,I ©♦v WASHERS WITH ft2 AWG INSULATED 0 <br /> STRANDED JUMPER.SUPPLY AND <br /> NEW OR EXISTING COLLECTION GROUND BAR. INSTALLED BY CONTRACTOR. <br /> OCOLLECTION GROUND BAR FINAL GROUND LEAD, <br /> 92 AWG STRANDED GREEN INSULATED COPPER <br /> CONDUCTOR TO MASTER GROUND BAR AT BASE 4"X 12"GALVANIZED STEEL BUSS <br /> OF TOWER,NEAR EXIT PORT 0 <br /> \ ?+ �" :///// <br /> BY ATC BAR ART it:BB-412-HDG-VZW,MFR N <br /> #`2 AWG GREEN INSULATED STRANDED COPPER 0 I� - � , O - ■ <br /> MI <br /> O Ls <br /> CONDUCTOR FROM ANTENNA,BIAS-T,AND <br /> \ / <br /> TRIPLEXER WITH MECHANICAL CONNECTION TO '+ - 0 0 0 0 0 0 0 0 0 0�01' 3/8"0 TYP. <br /> GROUND BAR. O O O O O O O O®®O O tl-O 3/8'0 X 3/4"SLOT TYP. <br /> NEW ANTENNA PLAN Withi... <br /> AT 152.0' A.G.LOOP <br /> • <br /> o la(ANTENNA RAD CENTER) <br /> 1 10" _',,NNNN I�X UNIVERSAL BUSS BAR MOUNTING <br /> KIT(PART X:BB-HKU,MFR BY ATC) <br /> 02/0 AWG INSULATED STRANDED (1? <br /> Ark <br /> CONDUCTOR DOWNLEAD J4 SITE SOLUTIONS <br /> ► <br /> O © TO MASTER GROUND BAR OR .olear✓is.vi SerServicesic <br /> illge <br /> v OTHER FINAL GROUNDING POINT <br /> COLLECTION GROUND BAR <br /> GENERAL NOTES 0 3 NOT TO SCALE WAVE <br /> 1. ALL CADWELD CONNECTIONS ON GALVANIZED <br /> R 0 H I T E C T U R E <br /> SURFACES SHALL BE CLEANED THOROUGHLY AND 0 <br /> COVERED WITH TWO(2)COATS OF SHERIMN WILLIAMS • ....., <br /> GALVANITE PAINT B350W3 OR EQUAL <br /> 1133 184TH STREET SW <br /> 2. ALL ELECTRICAL CADWELD AND MECHANICAL GROUND SUITE 202 <br /> CONNECTIONS WILL HAVE NON-OXIDATION COMPOUND NEW ANTENNA PLAN LYNNWOOD,WA 98087 <br /> APPLIED TO CONNECTION. OFFICE(425)77eae00 <br /> AT 142.0' A.G.L JAYENEWWAVEARCH.COM <br /> 3. ANY METAL OBJECTS WITHIN 6 FEET OF THE EXTERNAL (ANTENNA RAD CENTER) <br /> GROUND RING SHALL BE GROUNDED. <br /> DATE• 8-23-21 <br /> 4. ALL GROUNDING MATERIALS AND CADWELD MOLDS, <br /> SHOTS,ETC.,SHALL BE FURNISHED AND INSTALLED BY <br /> CONTRACTOR,UNLESS OTHERWISE NOTED. PREPARED BY. YML <br /> 5. THE ELECTRICAL CONTRACTOR SHALL FOLLOW © APPROVED BY. JYS <br /> GROUNDING SYSTEM INSTALLED AND TESTING <br /> PROCEDURES AS DESCRIBED IN THE GENERAL <br /> ELECTRICAL PROVISIONS. 0 SUBMITTALS <br /> m NO DATE DESCRIPTION <br /> LEGEND , , S. <br /> ITEM DESCRIPTION o . <br /> •-♦-- NEW MECHANICAL CONNECTION Off'° <br /> EXISTING MECHANICAL CONNECTION <br /> •--IF--- NEW EXOTHERMIC CADWELD CONNECTION EXISTING EXOTHERMIC CADWELD CONNECTION NEW EQ. PLAN 111) <br /> 8-23-21 FINAL PERMIT <br /> - <br /> AT 135.0' A.G.L 8-20-21 REVISED PERMIT <br /> 7-27-21 REVISED PERMIT <br /> 6-21-21 PREUMINARY PERMIT <br /> GROUNDING PLAN AND NOTES NORTH NOT USED <br /> 1 4 SCALE.3/4'• 1'-0'(22x34), 9/8'• 1'-O• 111x171 REGISTERED <br /> R.HITECT <br /> STRANDED CU WIRE WITH �� -" <br /> 1. ALL ELECTRICAL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE DESIGN AND 13.CONNECTIONS TO THE GROUND BUS SHALL NOT BE DOUBLED UP OR STACKED. GREEN,BOOV,THHN/THWN f iii. 822-` <br /> CONSTRUCTION SPECIFICATIONS AND ALL APPLICABLE LOCAL CODES. BACK TO BACK CONNECTIONS ON OPPOSITE SIDES OF THE GROUND BUS ARE INSULATION.SIZE AS AY Y. 0 <br /> 2. ALL GROUNDING SHALL CONFORM TO THE CURRENT VERIZON WIRELESS STANDARDS. PERMITTED. SPECIFIED -r~ --- STA OF WASHINGTON <br /> 3. CONDUIT ROUTINGS ARE SCHEMATIC.CONTRACTOR SHALL INSTALL CONDUITS SO THAT 14.USE OF 90°BENDS IN THE PROTECTION GROUNDING CONDUCTORS SHALL BE PANI SCHEME SPECIFICATIONS: <br /> ACCESS TO EQUIPMENT IS NOT BLOCKED. AVOIDED WHEN 45°BENDS CAN BE ADEQUATELY SUPPORTED. <br /> 4. THE CONTRACTOR IS RESPONSIBLE FOR PROPERLY SEQUENCING GROUNDING AND 15.GROUND RING SHALL BE LOCATED A MINIMUM OF 24"BELOW GRADE OR 6"MINIMUM PRODUCER(P) <br /> UNDERGROUND CONDUIT INSTALLATION AS TO PREVENT ANY LOSS OF CONTINUITY IN BELOW THE FROST LINE. TWO-HOLE LUG, CONNECTS TO WIRELESS EQUIPMENT CABINETS,CABLE ENTRANCE <br /> THE GROUNDING SYSTEM OR DAMAGE TO THE CONDUIT. 16.INSTALL GROUND CONDUCTORS AND GROUND ROD MINIMUM OF 1'-0"FROM BAR LUUG, <br /> 31 BOLTED TO GROUND BAR(WERE),MAINS EQUIPMENT <br /> FRAME GROUND BAR SITE <br /> 5. PREFABRICATED SHELTER WILL BE PROVIDED WITH INTERNAL WIRING AND EQUIPMENT EQUIPMENT CONCRETE PAD,SPREAD FOOTING,OR FENCE. ■1 1 GROUND JLES3 STEEL - - - - - GRO(MD N).AND STANDBY ENGINE-GENERATORION SET FRAME ANDD OTHER <br /> INSTALLED.FOR COMPLETE INTERNAL WIRING AND ARRANGEMENT REFER TO DRAWINGS 17.EXOTHERMIC WELD GROUND CONNECTION TO FENCE POST:TREAT WITH A COLD NOISE PRODUCING EQUIPMENT <br /> PROVIDED BY SHELTER MANUFACTURER. GALVANIZED SPRAY. HEX HEAD BOLTS AND <br /> 6. FOR INTERIOR EQUIPMENT LAYOUT AND LOCATION,SEE SHELTER MANUFACTURER'S 18.OBSERVE N.E.C.AND LOCAL UTILITY REQUIREMENTS FOR ELECTRICAL SERVICE HARDWARE. <br /> DRAWINGS AND SPECIFICATION.IN CASE OF CONFLICT THE DRAWINGS GOVERN. GROUNDING \ /\11f\Iti ABSORBER(A) SEA-DAGMAR <br /> 7. ALL GROUND CONNECTIONS BELOW GRADE SHALL BE EXOTHERMIC(CADWELD). 19.GROUNDING ATTACHMENT TO TOWER SHALL BE AS PER MANUFACTURER'S " P -� 1 ♦ CONNECTS TO THE EARTH ELECTRODE SYSTEM INCLUDING CENTRAL <br /> 8. ALL GROUND CONNECTIONS ABOVE GRADE(INTERIOR&EXTERIOR)SHALL BE FORMED RECOMMENDATIONS OR AT GROUNDING POINTS PROVIDED(2 MINIMUM) GROUND BAR ON WALL. Q O /1 O O O' �y O O O OFFICE GROUND GRID,BUILDING STRUCTURAL GROUND,METALLIC (MOD.SITE_5G L-SUB6) <br /> USING TWO(2)HIGH PRESS CRIMPS. 20.MAXIMUM RESISTANCE OF THE COMPLETED GROUND SYSTEM SHALL NOT EXCEED 5 FLOOR OR ON ANTENNA �:/ r WATER PIPE SYSTEM,ANTENNA SUPPORTING STRUCTURE GROUND <br /> TOWER SYSTEM,AND ELECTRICAL SERVICE ENTRANCE GROUND <br /> 9. ALL EXOTHERMIC CONNECTIONS TO THE GROUND RODS SHALL START AT THE TOP& OHMS. \© 0 000 0 � 0 O � O <br /> HAVE A VERTICAL SEPARATION OF 6"FOR EVERY ADDITIONAL CONNECTION. 21.MINIMUM BENDING RADIUS FOR GROUNDING CONDUCTORS IS 8"WHEN BENDING IS NON-ISOLATED(N) <br /> 10.ALL GROUNDING CONNECTORS TO BE CLEAN AND FREE OF PAINT AT THEIR MATING NECESSARY.GROUND CONDUCTORS ARE TO BE AS STRAIGHT AS POSSIBLE i - 1871 ROSS AVE <br /> CAD WELD WITH 92/0 AWG �/i,. j CONNECTS TO EQUIPMENT NOT IN AN ISOLATED GROUND ZONE(IGZ) EVERETT,WA 98205 <br /> SURFACES AND INSTALL PER MANUFACTURER'S RECOMMENDATIONS.ALL EXTERIOR 22.NO SPLICES PERMITTED IN GROUND CONDUCTORS. i, <br /> GROUND CONNECTIONS SHALL BE COATED WITH A CORROSION RESISTANT MATERIAL 23.ENSURE ALL MECHANICAL CONNECTORS ARE TORQUED TO THE MANUFACTURER'S SOLID TINNED BARE CU SUCH AS CBN EQUIPMENT FRAME GROUNDS AND DC GROUND <br /> 11.ALL EXTERIOR GROUND CONDUCTORS SHALL BE IQAWG TIN PLATED COPPER UNLESS SPECIFIED VALUES. WIRE OR STRANDED CU CONDUCTORS FOR DC POWER SYSTEMS THAT SERVE CBN OR BOTH <br /> OTHERWISE INDICATED. 24.GROUND BARS SHALL NOT BE FIELD MODIFIED. WIRE WITH GREEN,600V, / CBN AND IBN EQUIPMENT <br /> 12.GROUND RODS SHALL BE STAINLESS STEEL OR COPPER CLAD 25.ALL HORIZONTAL FENCE SECTIONS TO BE GROUNDED WITH 8"SINGLE BARREL THHN/THWN INSULATION / L._ SHEET TITLE <br /> STEEL,5/8"0 10-FT.LONG,AND SHALL BE DRIVEN VERTICALLY WITH THEIR GROUND STRAPS. TO ANTENNA STRUCTURE, ISOLATED(I) <br /> BARS AT BOTTOM OF TOPS 18"BELOW FINAL GRADE OR 6"BELOW FROST LINE FOR MAXIMUM DEPTH. 26.USE PANI SCHEME FOR LOADING ON MGB AS DISCUSSED IN NSTD 119,33&36. BUILDING <br /> MGB 'RING GROUND "GRO TO UND OR MONOPOLES SHALL EQU CONNECTS <br /> CTS TO THE SINGLE POINT CONNECTION BAR(SPCB),FOR IBN GROUNDING PLAN <br /> ORUSE EXOTHERMIC CONNECTION. NOTES, <br /> AND DETAILS <br /> SHEET NUMBER , <br /> 2 GENERAL NOTES 5 GROUND BAR CONNECTION DETAIL AND NOTES 1Pi.`NOT TO SCALE E-1 1 1 <br />