Laserfiche WebLink
VERETT <br />0 <br />Permit Inspections <br />City of Everett <br />NPDES MID <br />3/30/2023 <br />3/30/2023 <br />PROJECT <br />JIM KNAPPERT <br />APPROVAL <br />INSPECTION <br />Notes: <br />PERMIT EXTENSION <br />10/16/2023 <br />10/16/2023 <br />(REASON <br />SHARON <br />EXTENSION <br />REQUIRED) <br />GILFEATHER <br />APPROVED <br />Notes: <br />STILL IN PROGRESS <br />12/22/2023 <br />12/22/2023 <br />NPDESFINAL <br />JIM KNAPPERT <br />APPROVAL <br />INSPECTION <br />Notes: <br />APPROVED: All post -construction SWPPP elements have been adequately addressed. The site is fully stabilized; LID BMPs are protected from siltation <br />and compaction; all stormwater facilities are installed as designed and functioning; and all temporary construction BMPs have been removed or <br />restored for long-term protection. <br />PW 25-SITE <br />12/22/2023 <br />12/22/2023 <br />FINAL/PERMIT <br />JIM KNAPPERT <br />APPRVD-PERMIT <br />FINAL <br />CLOSE OUT <br />Notes: <br />206-446-2760 <br />craterconstructionllc@gmail.com <br />I <br />Printed: Wednesday, 27 December, 2023 2 of 2 rk <br />SUPERION <br />