My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1318 75TH ST SE 2024-03-01
>
Address Records
>
75TH ST SE
>
1318
>
1318 75TH ST SE 2024-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 3:57:39 PM
Creation date
2/13/2024 11:03:33 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
1318
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MISC LID BMP <br />T5.13: Post Construction Soil Quality and Depth <br />This section applies to lawn and landscape areas. <br />On your site plan, show the edge of all ground and vegetation that will be disturbed by the project. <br />1. Total Disturbed Area: ...................................................................................... 6969 ft2 <br />(Should match line 1 on the Stormwater project, page 2) <br />2. Onsite hard surfaces: .................................................................................... <br />3757 <br />ft2 <br />(Should match line 5 on the Stormwater project information, page 2): <br />3. Area of lawn or turf: ....................................................................................... <br />3212 <br />ft2 <br />4. Area of landscaping and planting beds: ............................................................. <br />0 <br />ft2 <br />5. Areas exempted from soil amendment requirements: .......................................... <br />0 <br />ft2 <br />(Due to existing tree roots, steep slopes, or wetland soils) <br />6. CHECK: The total of lines 2 through 5 should equal line 1. 6969 = 6969 <br />Calculate the Amendment Amount Needed <br />TURF/LAWN AREA <br />7. Area of lawn or turf (from line 3 above)........................................................... 3212 ft2 <br />Multiply by conversion factor from 1.75 inches to cubic yards (yd3): x 0.0054 <br />8. Amendment quantity needed for lawn or turf .................................................... 17.34 yd3 <br />9. Area of landscaping and planting beds (from line 4 above) ................................. 0 ft2 <br />a. Multiply by conversion factor from 3 inches to cubic yards (yd3): x 0.0093 <br />10. Amendment quantity needed for landscaping/planting beds ............................... 0 yd3 <br />11. TOTAL AMENDMENT QUANTITY NEEDED <br />(total of lines 8 and 10) 17.34 + 0 = 17.34---- yd3 <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.