My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1318 75TH ST SE 2024-03-01
>
Address Records
>
75TH ST SE
>
1318
>
1318 75TH ST SE 2024-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 3:57:39 PM
Creation date
2/13/2024 11:03:33 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SE
Street Number
1318
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
312
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 1. DETERMINE APPLICABILITY <br />Use the criteria below to determine if this template may be used for your project. If any <br />criteria below are marked "False," this template may not be used and a report meeting <br />Minimum Requirements#1-9 is required and shall be prepared by a professional Engineer <br />10 licensed in the State of Washington. <br />This project will create 2,000 square feet (ft2) or more, but less than 5,000 ft2, <br />of new plus replaced hard surface area OR will have 7,000 ft2 or greater of land <br />disturbing activities. <br />This project does not drain to the combined sewer. <br />This project converts less than 3/4 acre of existing soil cover or vegetation to <br />lawn or landscape areas. <br />This project will not adversely impact a water of the state. <br />This project will not change a natural drainage course and will not generate any <br />new concentrated flows leaving the site. <br />This project will not be constructed within a critical area or a critical area buffer <br />and will not adversely impact a critical area. See the City of Everett Municipal <br />Code, Title 19.37. <br />This project will follow the SWMMWW design criteria to satisfy Minimum <br />Requirement #5 rather than an engineered design. <br />What are the minimum technical requirements (MR) for a small project? <br />■ MR #1: Preparation of a Stormwater Site Plan (Report and Plans) <br />■ MR #2: Construction Stormwater Pollution Prevention Plan (SWPPP) <br />■ MR #3: Source Control of Pollution <br />■ MR #4: Preservation of Natural Drainage Systems and Outfalls <br />■ MR #5: On -Site Stormwater Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.