Laserfiche WebLink
u <br />Task 2: Select where the project will discharge its stormwater <br />❑ An existing piped conveyance system <br />❑ Outlet protection such as rip -rap pad (less than 0.3 CFS) <br />❑ Dispersion trench or other dispersion facility (0.3 to 0.75 CFS) <br />❑ Piped conveyance to appropriate discharge location with easement if required <br />(greater than or equal to 0.75 CFS) <br />0 Other. sump pum o 75th st <br />Sump -pump will be directed <br />to a perforated stub -out <br />connection and connect to an <br />existing CB on Cascade Dr. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 16 <br />