Laserfiche WebLink
10/19/23, 8:28AM waenergycodes.com/print_ project_summary_form.php?k=Y29tYm9fdGZ2X3BOPWlIY19odmFjX3N5cl96b25pbmdfc2luZ2xIJTdDcGRfYWxOZXJhdGlvbiZOZnY9bWVjX2h2YWNfc31... <br />MECHANICAL COMP Y <br />2018 WSEC Compliance Forms for Commercial Buildings including Group R2, R3 & R4 over 3 stories and all Rl Administered by: ©2023 NEEA, All rights reserved <br />Project & Applicant <br />Information <br />Project Title <br />P5812 - 2729 Colby Ave - RTU installation - 2018 WSEC <br />For Building Department Use: I Date' Oct 19, 2023 <br />Project Address <br />2729 Colby Ave <br />2729 <br />Everett, WA 98034 <br />Applicant Name <br />Chris Stone <br />Applicant Phone <br />206-573-6130 <br />Applicant Email <br />chris.stone@psrmechanical.com <br />For questions about this report, contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br />General Occupancy <br />All Commercial <br />General Building Use Type <br />Office, Other <br />Building Cond. Floor Area <br />1,390 <br />General Project Types <br />Alteration <br />New Building <br />or Addition <br />Mechanical Scope <br />Alteration <br />Mechanical Scoe <br />p <br />Single Zone Systems &Equipment <br />Project Cond. Floor Area <br />1,390 <br />Floors Above Grade <br />1 <br />Compliance Method <br />Compliance Method 1 - General <br />Mechanical Project Description <br />Project <br />Mechanical Scope <br />Economizer <br />Exception(s) <br />DOAS Ventilation <br />Higher Equipment <br />Equipment Efficiency <br />Compliance <br />Mechanical Compliance <br />Type <br />Applied? <br />Provided? <br />Efficiency Option Applied? <br />Verification <br />Scope and Method <br />Alteration <br />Single Zone Systems & <br />Yes <br />No <br />NA <br />COMPLIES <br />Equipment <br />Additional Efficiency <br />Credits Included (AEC) <br />Does building include occupancy classifications requiring <br />No <br />Does ro ect include DOAS equipment? <br />p <br />No <br />DOAS? <br />Based on project scope do TSPR requirements apply? <br />No <br />Do all systems comply with Appendix D standard reference design or qualify for an exception to <br />No <br />TSPR. <br />Scope & Space Conditioning ALTERATION - SINGLE ZONE SYSTEMS & EQUIPMENT Compliance Verification COMPLIES <br />Single Zone Air Systems Category - Heat pump, packaged (PTHP, SPVHP, room) <br />Air Systems Summary Information <br />System/Equip ID <br />Quantity <br />of Items <br />Supply Airflow <br />Control <br />Ventilation Standard <br />Ventilation CFM <br />(Total if Multiple Items) <br />Ventilation <br />Air Source <br />Paired with DOAS <br />Ventilation energy recovery <br />Energy Recovery <br />Efficiency (%) <br />HP-31 <br />I Constant volume <br />ASHRAE Standard 62.1 <br />77 <br />Integral <br />Air Systems & Equipment - Cooling <br />System/ <br />Cooling System/Equip <br />Cooling <br />AEC <br />Econo Exception <br />Combined Efficiency <br />Proposed <br />CE <br />Proposed Part <br />PL <br />Efficiency <br />Equip <br />Type <br />Specific Type <br />Capacity <br />Efficiency <br />Multiplier (FL & <br />Multiplier (AEC & <br />Cooling <br />Units <br />Units <br />Units <br />Compliance <br />ID <br />per item (Btu/h) <br />Multiplier <br />PL) <br />Econo) <br />Efficiency <br />Efficiency <br />Verification <br />HP-3 <br />Heat pump, terminal (PTHP) <br />Packaged terminal HP, <br />replacement <br />23,800 <br />1 <br />0 <br />1 <br />14.4 <br />EER <br />COMPLIES <br />Air Systems & Equipment - Heating <br />Sym ste <br />Heat Pump Heating Capacity <br />Cooling Capacity <br />AEC <br />Proposed Heat <br />HPH <br />Proposed Low <br />LTH <br />Efficiency <br />/Equip <br />Heating System/Equip Type <br />Specific Type <br />(Btu/h) <br />(Btu/h) <br />Efficiency <br />Pump <br />Units <br />OSA <br />Units <br />Compliance <br />ID <br />Multiplier <br />Heating Efficiency <br />Temp Efficiency <br />Verification <br />I I P 3 <br />Heat pump, terminal (PTHP), <br />Packaged terminal HP, <br />23.200 <br />23,800 <br />1 <br />3.7 <br />COP <br />COMPLIES <br />heating <br />replacement <br />Air Systems & Equipment Details <br />System/Equip ID I Area(s) Served Location In Project Documents - Plan/Detail # <br />https://waenergycodes.com/print_project _summary_form. php?k=Y29tYm9fdGZ2X3BOPW 1 IY19odmFjX3N5cl 96b25pbmdfc2luZ2xIJTdDcGRfYWxOZXJhdGlvbiZOZnY9bWVjX2h2YW Nfc3lzX3pvbmluZ1... 1 /2 <br />