CITY OF EVERETT
<br />2024 STANDARD
<br />HOURLY RATE SCHEDULE Water | Land | Infrastructure | Facilities
<br />Effective January 1, 2024
<br />Rev. 12/12/2023
<br />DESCRIPTION HOURLY RATE
<br />1.Office Tech I, Expediter I $ 65.00
<br />2.Office Tech II, Expediter II, Survey Field Tech $ 80.00
<br />3.Intern, Survey Tech I, Jr. CAD Tech, Jr. Inspector, Office Tech III $ 100.00
<br />4.Designer, Jr. Planner, Survey Tech II, CAD Tech, Inspector, Sr. Office Tech,
<br />Jr. Ecologist/Scientist $ 120.00
<br />5.Jr. Engineering Staff, Designer I, Planner, GIS Tech, Survey Tech III, CAD Tech I, Inspector I,
<br />Project Administrator, Ecologist/Scientist $ 136.00
<br />6.Engineering Staff I, Designer II, Planner I, Survey Tech IV, GIS Analyst I, CAD Tech II, Inspector II,
<br />Sr. Project Administrator, Ecologist/Scientist I $ 151.00
<br />7.Engineering Staff II, Designer III, Planner II, GIS Analyst II, CAD Tech III, Inspector III, Survey Tech V,
<br />Ecologist/Scientist II, Landscape Architect I $ 166.00
<br />8.Project Designer, Planner III, Sr. Survey Tech, GIS Analyst III, Engineering Staff III, Sr. CAD Tech,
<br />Sr. Inspector, Ecologist/Scientist III, Landscape Architect II $ 181.00
<br />9.Engineer IV, Project Designer I, Sr. Planner, Project Surveyor, Sr. GIS Analyst, CAD Manager,
<br />Project CAD Tech, Sr. Project Inspector, Engineering Staff IV, One-Person Crew, BIM Manager,
<br />Ecologist/Scientist IV, Landscape Architect III $ 194.00
<br />10.Project Engineer, Project Designer II, Project Planner, Sr. Project Surveyor, Sr. Project GIS Analyst,
<br />Structural Engineer, UAS Pilot, Ecologist/Scientist V, Landscape Architect IV $ 209.00
<br />11.Sr. Project Engineer, Sr. Structural Engineer, Sr. Project Designer, IT Manager, Sr. Project Planner,
<br />Survey Project Manager, Tech Services Manager, Sr. Ecologist/Scientist, Sr. Landscape Architect $ 222.00
<br />12.Project Manager, Principal Surveyor, Planning Project Manager, Principal Ecologist/Scientist $ 238.00
<br />13.Sr. Project Manager Sr. Principal Surveyor, Two-Person Crew,
<br />Sr. Principal Ecologist/Scientist $ 252.00
<br />14.Principal Engineer, Principal Planner, Sr. Two-Person Crew $ 272.00
<br />15.Sr. Principal Engineer, Sr. Principal Planner $ 288.00
<br />REIMBURSABLES
<br />A.Subconsultants, Professional and Technical Cost + 5%
<br />B.Project Administration $60.00/Invoice
<br />C.Maps, reports, materials, permit fees, express delivery and messenger,
<br />pass-through bills, and similar items necessary for work in progress Cost
<br />D.Out-of-Town travel and cost of commercial transportation Cost
<br />(Meal per diem per federal per diem rules.)
<br />(Air travel, if needed, will be authorized and arranged by the City.)
<br />E.Transportation within 30 Mile Radius *No Charge
<br />Transportation beyond 30 Mile Radius – Automobile At Approved IRS Rate
<br />* On job inspection mileage will be billed At Approved IRS Rate
<br />F.Printing Costs
<br />Large Format Blueprints and Reproduction – Bond $ 0.50/sq ft
<br />Large Format Blueprints and Reproduction – Mylar $ 1.50/sq ft
<br />Color Copies – In-house (8½ x 11)$ 0.25/page
<br />G.Expert Witness Rate x 1.5
<br />Notes: 1 All payment is due within 30 days from date of invoice. A monthly service charge of 1% will be added on all accounts
<br />older than 30 days.
<br />2 PACE shall be entitled to annual increase in billing rates shown on each anniversary of the contract execution date.
<br />This increase shall be 3% or the rate of inflation as determined the Seattle area Consumer Price Index (CPI)
<br />published by the U.S. Bureau of Labor Statistics, whichever is higher.
<br />Exhibit B
|