Laserfiche WebLink
CDR <br /> RM FACP LEGEND <br /> 3RD FLOOR SEE SHEET EOA FOR SYMBOLS AND ABBREVIATIONS. <br /> REFER TO SHEET E511 FOR FIRE ALARM ABBREVIATIONS. <br /> 2ND FLOOR <br /> ELEVATORS GENERAL`L NOTES: <br /> 134/135 SV23-T22 WE POS 613 11:021 SV23-T32 WF POS 713 11:031 1. RISER MAY NOT SHOW ALL FIELD DEVICES. SEE PLAN <br /> FACP SV23—T22 TAMPER POS 6B 11:020 SV23—T32 TAMPER POS 7B L1:030 SHEETS FOR LOCATIONS OF EQUIPMENT. <br /> 3 <br /> 5 2. THE RACEWAY CONFIGURATION AND ROUTING SHOWN ARE <br /> 6 SV23-T24 WF POS 6A 11:023 SV23-T30 WF POS 7A 11:029 DIAGRAMMATIC AND DO NOT NECESSARILY REPRESENT <br /> SV23—T6 WF POS 413 11:002 SV23—T12 WF POS 3A 11:008 SV23—T16 WF POS 2A 11:012 SV23—T24 TAMPER POS 6A 11:022 SV23—T30 TAMPER POS 7A L1:028 ACTUAL INSTALLATION FINAL PATHS SHALL BE <br /> SV23—T6 TAMPER POS 413 11:003 SV23—T12 TAMPER POS 3A 11:009 SV23—T16 TAMPER POS 2A 11:013 SV23-55 DETERMINED BY ELECTRICAL CONTRACTOR. <br /> ISO TAMPER L2:026 <br /> SV23-55 SV23—T26 WF POS 513 11:025 ED 40-23 FACP MONITORING POINTS: <br /> SV23-T8 WF POS 4A 11:005 �SV23-T14 <br /> SV23-T14 WF POS 2B 11:010 SV23-T18 WF POS 1B L1:014 �WF PRESSURE 12:006 SV23-T26 TAMPER POS 5B L1:024 ELEV. 9 FA 12:061 <br /> SV23-T8 TAMPER POS 4A 11:004 TAMPER POS 2B 11:011 SV23-T18 TAMPER POS 113 11:015 SV23-57 ELEV. 9 TRBL 12:062 <br /> ISO TAMPER 12:027 <br /> SMOKE DET @ FACP 11:001 PD SV23-57 SV23-T28 WF POS 5A L1:027 E2�>40-23 FACP MONITORING POINTS: <br /> SV23-T10 WF POS 313 L1:007 �VS <br /> SV23-T20 WF POS 1A L1:016 PD WF PRESSURE 12:007 SV23-T28 TAMPER POS 5A L1:026 ELEV. 10 FA 12:063 <br /> SV23-T10 TAMPER POS 3B L1:006 SV23-T20 TAMPER POS 1A L1:017 —SV24-8 ELEV. 10 TRBL 12:064 <br /> S PD -,,,_ISO TAMPER 12:037 <br /> MAN PULL @FACP 11:019 SV24-2 SV24-8 3�40-23 FACP MONITORING POINTS: <br /> SV23-49 WE PRESSURE 12:017 ELEV. 134/135 FA L2:065 <br /> ISO TAMPER12034 SO TAMPER 2:023 SV24-4 <br /> 1ELEV. 134 135 TRBL 12:066 <br /> 90-23 FACP SV24-2 SV23-49 ISO TAMPER 12035 q <br /> 10 C / <br /> F @ E.5/8.7 WF PRESSURE 12:014 vs SV24-4 MPER 12:038 <br /> v 90-22> PD wF WF PRESSURE 12:003 40-23 FACP MONITORING POINTS: <br /> YY—SV23-47 WE PRESSURE 12:015 10 4 <br /> SV24-12 SV24-14 CDR RM. FACP FA 12:067 <br /> ISO TAMPER 12:022 WERESSURE L2:018 ISO TAMPER 12:039 ISO TAMPER 12:040 <br /> PD SV23-47 61 SV23-63 SV23-14 CDR RM. FACP TRBL 12:068 <br /> f ELEVATOR PD AMPER L2:029 <br /> PD WF PRESSURE 12:002 10 FACP PD �WE PRESSURE 12:019 WE PRESSURE 12:020 <br /> SV23-45 61 SV23-63 Vs SV23-67 <br /> EVF-FA-40-23 PD ��ISO TAMPER 12:021 � PD WERESSURE L2:009 PD f ISO TAMPER 12:030 PD WF ISO TAMPER 12:032 <br /> WE PRESSURE 12:001 SO TAMPER 12:025 PD WEAMPER 12:028 PD WE PRESSURE 12:010 PD WE WE PRESSURE 12:012 REFERENCE DRAWINGS <br /> 120VAC EMERGENCY POWER SV23-53 59���///�WF PRESSURE 12:005 RESSURE 12:008 5�E511-3 ELEVATOR RISER DIAGRAMS <br /> SV23-51 6 E528, E529 ELEVATOR 134, 135 FLOOR PLANS <br /> FATC ISO TAMPER 12024 <br /> /2.75 PD SV23-51 FATC <br /> f <br /> WE PRESSURE L2:004 ELEVATOR SV23-63 7�DETAIL 1/E511-5 FATC DIAGRAM <br /> 10 PD 9 FACP COLUMN <br /> SV24-6 COLUMN TAMPER L2:031 <br /> PD SOTAMMPER 12:036 E ] (PRIOR ADT SV PRESSURE LS:01� s ®DETAIL 2/E511-5 FATC DIAGRAM <br /> WF PRESSURE 12:016 � 59-5-25) PD F DETAIL 3/E511-5 FATC DIAGRAM <br /> 1 ST FLOOR 13 10>DETAIL 4/E511-5 FATC DIAGRAM <br /> TO LOOP 3 (L3:), SO TAMPER 12033 11 DETAIL 5/E511-5 FATC DIAGRAM <br /> FOR CONTINUATION vs SV23-Ti 12 DETAIL 1/E511-6 FATC DIAGRAM <br /> SEE SHEET E511-7 SV24-2 TAMPER L2054 PD WE WE PRESSURE L2:013 <br /> FATC VS SV23-47 TAMPER 12:042 SV24-4 13 DETAIL 2/E511-6 FATC DIAGRAM <br /> E/8.5 <br /> V s SV23-45 TAMPER 12:041 vs SV23—T1 TAMPER L2:053 TAMPER SV24-6 TAMPER L2056 <br /> vs 14 DETAIL 3/E511-6 FATC DIAGRAM <br /> vs vs 12055 SV23-53 TAMPER 12:045 <br /> SV23-49 TAMPER SV23-51 TAMPER 12:044 15 DETAIL 4/E511-6 FATC DIAGRAM <br /> 12:043 <br /> FATC SEC 231 TAMPER FATC FATC 1 FATC 2 <br /> E/6 11:018 '/2'75 1/5.75 1/5.75 <br /> ® " 12 14 CONSTRUCTION NOTES <br /> 1. SEE FLOOR PLANS FOR WORK TO BE PREFORMED. <br /> FATC <br /> FATC 1.1/8.5 <br /> E/3f <br /> �5 SV23-67 <br /> vs TAMPER 12:052 <br /> SV24-8 SV24-10 vS SV23-63 vs <br /> TAMPER 12:057 TAMPER 12:058 TAMPER 12:050 SV24-14 <br /> SV23-55 SV23-61 TAMPER L2:060 <br /> TAMPER L2046 TAMPER L2:049 SV24-12 <br /> SV23-57 SV23-59 TAMPER 12:059 <br /> SV23-65 <br /> TAMPER L2047 TAMPER L2:048 f <br /> TAMPER 12:051 <br /> SV23-61A WE <br /> 12:070 <br /> SV23-61A <br /> TUNNEL 40-22 40-2340-24 WEST TAMPER 12:069 <br /> FIRE ALARM SYSTEM RISER - EVT-FA-40-23 - LOOP 1 AND LOOP 2 (L1 : & L2:)(T) 1 <br /> SCALE: NONE E51`--2 OJ ` <br /> SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATEDRAWN DATE SUBTITLE CURRENT REVISION SYMBOL n DATE <br /> ACCEPTABILITY JAS 07/26/23 FIRE ALARM SYSTEM RISER 07.27.23 <br /> THIS DESIGN AND <br /> A EVERETT FIRE PANEL REPLACEMENT— RECORD W2640474 SAZAN/ZO 6/26/20 K.M. 07/27/23 SHEET <br /> S <br /> PECIFICATION AND/OR CHECKED <br /> IS APPROVED <br /> APPROVED BY DEPT. DATE K.M. 07/24/23 TITLE 1 E511 2 <br /> B IFC — HBL EXPANSION — POSITIONS 5, 6 AND 7 JAH SMS 06/30/23 ® HBL EXPANSION — POSITIONS 5, 6 AND 7 <br /> BOE/A/G CHECKED <br /> C SHOP DRAWINGS DRAWINGS 30481184 FASDESIGN AGOW/PL 07/28/23 <br /> Pete linamen BUILDING 40-023 JOB N0. COMP NO. <br /> UAk,ao.x_� IIx APPROVED 30481184 <br /> APPROVED ELECTRICAL MASTER EVERETT, WA, DWc NO. 40-023-1E511-2 <br />