Laserfiche WebLink
• • <br /> Mr. Banks, <br /> Please find attached the existing generator submittal clearly stating the capacity is well within the <br /> calculations we have provided on the plans dated May 4th, 2021. I have parsed the comments from your <br /> e-mail to Aaron at Abacus below and addressed each one in my response. <br /> "I do not think that this new set of plans encompasses all of the work that was done• <br /> as not,been i <br /> co'frpletedPemit E1910-184 has a <br /> description of work of"ALTER CIRCUITS- (7) FROM ESO TO ESA" . I do not see a before and after load <br /> calculation and one line for all of those effected panels a se rag of o r.*VA; <br /> Ire lam .y. IneAn following pa _. itbm <br /> calek#WQM I also still see the generator listed as a 100 kw which does not appear to have enough <br /> capacity for the calculated load. Perhaps this generator is not labeled properly. Please make sure you <br /> address the correction letter sent to Aaron McMullen dated 1-21-21 for the above permit. <br /> generatorr;t fll load cilit , f 347`Ar a fit„ .. <br /> These plans,,do not include any information for panel ESO that is in the description of work as being <br /> altered. Panel. a er+ ly:a Typr3 r �' .., is . ..t on <br /> the front cov . viseddrawin <br /> Thank you, <br /> <OutlookEmoji-1544909313009_Adriandd0ac189-17d0-4246-a405-786b7479790a.jpg> <br /> Adrian M. Steik, SET, MSFPE <br /> President <br /> <Genset Everett.pdf> <br /> 2 2 <br />