Laserfiche WebLink
• 0 . <br /> Adrian, <br /> I have not seen the generator submittal. It is not attached. My concern with the generator is, that if it is 100 kw at 208 <br /> volt 3 phase that math and the charts I have been looking at is only 278 amps. I did find a 100 kw generator on single <br /> phase chart that has the 347 amps.This system is labelled 208 volt 3 phase and this is my concern. <br /> The issue with the scope of work on this permit. Permit E1910-184 is that 7 circuits were alter- moved from one panel to <br /> the other. The plans need to show the load calculations and panel schedules for all affected panels both before and <br /> after not just after.This is required by WAC 296-46B-900(3)(h). <br /> Please note how the load calculations are formulated. Meaning was this projected metered with a demand meter etc. <br /> per WAC 296-46B-900(3)(j) <br /> Thank you, <br /> Steve Banks <br /> LiIII Electrical Inspector I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett,WA 98201 <br /> EVERETT everettwa.gov/permits I Facebook I Twitter <br /> Note:Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br /> Records Act. <br /> From:Tim Mitchell <tmmitchell@safeconsulting.biz> <br /> Sent:Thursday,June 10, 2021 1:28 PM <br /> To:Steve Banks<SBanks@everettwa.gov> <br /> Cc: Adrian M. Steik<amsteik@safeconsulting.biz>; Aaron McMullen <aaron@abacuselectricllc.com>; Marvin J. Whitney <br /> <marv@safeconsulting.biz>;Joseph M. Mitchell <jmmitchell@safeconsulting.biz> <br /> Subject: Fw: Everett Care Center#E1910-184 <br /> Hi Steve, FYI. Please see below. Let me know if there are any questions. Take care, Tim Mitchell 206-679- <br /> 2794 <br /> Mr. Banks, <br /> Please find attached the existing generator submittal clearly stating the capacity is well within the <br /> calculations we have provided on the plans dated May 4th, 2021. I have parsed the comments from your <br /> e-mail to Aaron at Abacus below and addressed each one in my response. <br /> "I do not think that this new set of plans encompasses all of the work that was done.Other electrical <br /> Manned and a permit applicatio °. !mined rt has not been issued e to <br /> t is permit not being finaled. No other fitted work has beef, pfeted. Permit E1910-184 has a <br /> description of work of"ALTER CIRCUITS- (7) FROM ESO TO ESA" . I do not see a before and after load <br /> calculation and one line for all of those effected panels e` e E1.1 of ' \ m ch <br /> shows the before and, : one-line andfollowing p showscurrent p dad' <br /> calculations. I also still see the generator listed as a 100 kw which does not appear to have enough <br /> capacity for the calculated load. Perhaps this generator is not labeled properly. Please make sure you <br />