My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
617 LEGION DR 2024-02-14
>
Address Records
>
LEGION DR
>
617
>
617 LEGION DR 2024-02-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2024 2:22:53 PM
Creation date
2/14/2024 2:22:27 PM
Metadata
Fields
Template:
Address Document
Street Name
LEGION DR
Street Number
617
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ! <br /> '3:See the following commens: <br /> a. The door should specify a closer. See Section R302.5.1. <br /> SELF CLOSER INTRODUCED; HALL TO GARAGE <br /> b. The new hallway includes a washer/dryer unit that appears to encroach on the minimum 3- <br /> foot hallway width per Section R311.6, which is not permitted. <br /> KILLED <br /> c. The new bonus room has been effectively configured to qualify as a bedroom (i.e., egress <br /> window, separation from the garage). Smoke and CO alarms should be provided per <br /> Sections R314 and R315. The alarms should be hardwired and interconnected as required <br /> NOW HARD WIRED CALLED OUT. <br /> 4. The note is note sufficient. A detail specifying the construction should be included. <br /> HAD A NOTE ON SECTION: fire protection construction per IRC Section R302 NOW DUPLICATED ON <br /> FLOOR PLAN <br /> 6. Sheet A001 does not appear to include a schedule of energy credits. The statement "Alternations <br /> do not need to obtain energy credits" is not correct. This is an addition, defined in the WSEC as <br /> adding conditioned space to the house. Energy credits are required. <br /> THOUGHT ALTERATION WORKSHEET WOULD SUFFICE; SEE SHEET A001 WITH NEW <br /> ENERGY CALC; NEW HEAT PUMP FOR BONUS & BATH <br /> 7. Minimum clearances should be dimensioned on the drawings. <br /> ASSUME THIS IS FOR THE BATH; NEW DIMS PROVIDED <br /> 8. See Comment 11 below. <br /> 9. This comment is not sufficient. The required construction should be shown. <br /> I HAVE HEADERS CALLED OUT ; WANT CRIPPLES CALLED OUT? <br /> 11. This comment has not been addressed. The existing construction of the space being converted <br /> must be shown. It is required to comply with the current code for new construction. Note that this <br /> addition was originally constructed in 1958 and is not expected to comply with the current code <br /> requirements without modifications. All construction requirements, including but not limited to <br /> foundations, NO REAL DISOVERY HAS BEEN DONE; ASSUMED TO BE 12" WIDE FOOTING w/ <br /> 6" CONCRETE WALL <br /> framing, IT IS ASSUMES TO BE MIN 2 X 4 STUDS AT 16" OC <br /> sill plate anchorage, ASSUMED TO BE SOME SORT OF ANCHORAGE; ON FOUNDATION <br /> PLAN; <br /> NOTE: ADDED MST 48 AT 48" OC ATTACHED TO FOUNDATION TO SHEARWALL ABOVE <br /> roof construction, 2 X 8 HF #2 RAFTERS @ 24" OC AND 2 X 6 COLLARE TIES <br /> braced wall panels, ASSUMED TO BE NOMINAL NAILING PATTERN <br /> and framing fasteners, should be specified. NOMINAL NAILING PATTERN <br /> PER Sections R102.7 and R102.7.1. <br /> R102.7.1Additions, alterations or repairs. Additions, alterations or repairs to any structure shall conform to the <br /> requirements for a new structure without requiring the existing structure to comply with the requirements of this <br /> code, unless otherwise stated <br /> I4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.