Laserfiche WebLink
14 SPR-X22-370-WHT-AC Module 5.04kW PV Array NOTES: I <br /> (2 branch circuits @ 9 & 5 AC modules: 1.ALL AC PV MODULES SHALL BE CONNECTED WITH MANUFACTURER SUPPLIED CONNECTORS. <br /> 4480W AC Max Output) 2.INVERTER BRANCH CIRCUIT TRANSITION BOX SHALL BE LOCATED ON THE ROOF AND NEMA 3R <br /> RATED. <br /> SPR X-22-370-ACPV SPR X-22-370-ACPV 3.ALL WIRES FROM ROOF TRANSITION BOX TO AC COMBINER PANEL SHALL BE 10AWG.THWN-2 AND <br /> AC Modules AC Modules IN CONDUIT TO MEET NEC CODE AND LIMIT VOLTAGE DROP TO LESS THAN 2%. <br /> 240AC/1.3ac max 4.WIRING IN DC CIRCUITS TO BE RATED 600V-90C,EXPOSED CABLES SUNLIGHT RESISTANT. <br /> 240AC/1.3aC max 5.PV SYSTEM Voc SHALL NEVER EXCEED 600 VDC. <br /> Output output MARKING/LABELING 6.PRODUCTION METER&PV SYSTEM DISCONNECT SHALL BE_OCATED NEXT TO NET-METER. <br /> j i 7.PV MODULE,MICRO-INVERTER AND RACKING CONTINUOUS GROUNDING CONDUCTOR TO <br /> �.s+T�� PER NEC 690/705 GROUNDING ELECTRODE SHALL BE 6AWG. <br /> 0:0,, P' AC0 <br /> C AC <br /> '••%%i , � Module I I; I Module 1 SYSTEM INCLUDES RAPID SHUTDOWN AND REQUIRED LABELING. <br /> :t.*'a` '411♦ RAPID SHUTDOWN IS INITIATED BY LOSS OF UTILITY POWER. <br /> I I SOLAR kWh METER FOR <br /> IL <br /> See I I PRODUCTION <br /> i3rail INCENTIVES 120/240 VAC 10 <br /> detail at right I at n^f?` I Location:NEXT TO <br /> NET METER P 125 am FROM UTILITY <br /> I service SPR-370-X22-ACPV MODULE <br /> / @� L2 <br /> or"Pi ' <br /> ~,:.,>* R !i! � - I L1 L2 -- I Meter#: I Module DC <br /> : � ' 'I 4 I `- ,H 1 1000589252 input <br /> I. I ��♦S �. 1 NEMA 3R- 7 • - #10, THWN-2 copper NM/ <br /> !k y � ♦ 30amp AG 240 VAC 1 60HZ, <br /> I I Locking 18.7 AAC(max) I_ DC <br /> Disconnect 4480Wmp <br /> I I Visible- <br /> Break I AC <br /> I <br /> Location: IZSA <br /> I NEXT TO <br /> MNET ETER orb , SseMG� `125 <br /> \\ L1 G L2 <br /> Inverter AC output: <br /> I #10, i { 320watts,240vac/1.33A ,I <br /> w .�..y • THWN-2 .u! .1 I I * t 04. <br /> �j�!►�ie! > I y copper —` 30a I N $"3Msr s* <br /> I <br /> j › . III % n► Kh �... - WFi <br /> -1 AC k' s.1 ►!�! 1 AC La ( I. I 0 � .<, ((tcI,,�>) • <br /> • '�.:d�: Module 1 <br /> LI Module I <br /> 1 1 i 9 1 1 I 5 j 20A - — i % 0 Router <br /> 2 1 I 2 1 1 I �r■� .... •L , • Internet via HomePlug <br /> 1 1 ��20A EQUIPMENT GROUND__1_. AND WiFi and open <br /> 1 I 1 I - PVSS Hard Wired connection in garage space in customer router <br /> �, 20A SUPER ^ - -- - - <br /> �7 —��— VISOR }.--v WiFi Utility District: PROPERTY OF Sunergy <br /> `� SI1oPUD systems L SYSTEMS <br /> Customer. 4546 Leary Way NW <br /> NEMA 100amp ac Jurisdiction. Dively Seattle,WA 98107 <br /> 3R roof Combiner panel: Internet via Everett Project: <br /> junction Location:NEXT HomePlug AND Drawn By: 5.18kW SunPower-ACPV Photovoltaic system <br /> box TO NET WiFi and open Jon Lange.NABCEP site Address, Title/Part/Descrition: <br /> METER space in Electrical Engineer: <br /> customer router Howard Lamb,MSEE 4301 Terrace Drive PV ELECTRICAL <br /> Date:1/8/19 Everett,WA 98203 CONFIGURATION DRAWING <br /> Signatures: <br /> Engineer: <br />