My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Hultz BHU Engineers Inc. 2/15/2024
>
Contracts
>
6 Years Then Destroy
>
2024
>
Hultz BHU Engineers Inc. 2/15/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 2:37:23 PM
Creation date
2/16/2024 9:11:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Hultz BHU Engineers Inc.
Approval Date
2/15/2024
End Date
12/31/2024
Department
Procurement
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
RFQ - Everett Station HVAC controls replacement and maintenance
Tracking Number
0004188
Total Compensation
$194,090.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Hultz BHU Engineers, Inc. 11/26/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Hultz|BHU Engineers | Page 16 <br />KOMACHIN MIDDLE SCHOOL | RENOVATION <br />Company Name: North Thurston Public Schools <br />Address: 3650 College Street SE, Lacey, Washington 98503 <br />Point of Contact: Tony Matiatos, Assistant Director, Construction & Design <br /> amatiatos@nthurston.k12.wa.us, 360.412.4500 <br />Start Date: 2020 Completion Date: 2023 <br />Contract Value: $453,000 Construction Value: $29 million <br />Description: Remodel of a 110,000 square foot middle school with installation <br />of a complete new HVAC system and DDC controls. The middle school has <br />been occupied during construction, with phased construction over two years. <br />New systems include multiple fan coil units, central boiler, central chiller, energy <br />recovery DOAS units, and open protocol DDC controls. <br />KITSAP COUNTY JAIL | HVAC REPLACEMENT <br />Company Name: Kitsap County <br />Address: 614 Division Street, Port Orchard, Washington 98366 <br />Point of Contact: Glen McNeill, Project Manager <br /> gsmcneill@kitsap.gov, 360.337.4789 <br />Start Date: 2022 Completion Date: 2024 <br />Contract Value: $500,000 Construction Value: $7.5 million <br />Description: Replacement of the complete HVAC system and controls for this <br />multi-story jail in Port Orchard. New equipment includes heat recovery units, <br />multizone units, VRF system, engineered smoke control system and new DDC <br />controls. <br />Project is phased to allow for full occupancy during construction. <br />SECTION 3 | PERFORMANCE <br />OLYMPUS HALL | HVAC REPLACEMENT <br />Company Name: Everett Community College <br />Address: 801 Wetmore Avenue, Everett, Washington 98020 <br />Point of Contact: Jonathan Martin, DES Project Manager <br /> jonathan.martin@des.wa.gov, 360.239.3350 <br />Start Date: 2015 Completion Date: 2016 <br />Contract Value: $160,000 Construction Value: $1.25 million <br />Description: Hultz/BHU provided the engineering for the HVAC system and <br />equipment upgrades, as well as the improvements to the electrical and fire alarm <br />system. The mechanical work included new gas fired high-efficiency boilers, <br />new rooftop air handling units, replacement of the existing ceiling, new ductwork, <br />and new DDC controls. Our in-house electrical team provided the necessary <br />connections required to accommodate the new system.
The URL can be used to link to this page
Your browser does not support the video tag.