My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8208 FLORIDA DR 2024-02-26
>
Address Records
>
FLORIDA DR
>
8208
>
8208 FLORIDA DR 2024-02-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 11:55:18 AM
Creation date
2/16/2024 2:10:55 PM
Metadata
Fields
Template:
Address Document
Street Name
FLORIDA DR
Street Number
8208
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIWVORKS PERMIT Date Applied: 4/18/2022 <br /> City of Everett Permit Services Publi orks Permit#: PW2204-014 <br /> EVERETT 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: W2204-012 <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON 425-257-8810 Public Works Fee: $160.00 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> NGUYEN IVY NGUYEN IVY <br /> 8208 FLORIDA DR 8208 FLORIDA DR <br /> EVERETT,WA,98203 EVERETT,WA,98203 <br /> PHONE:4252682298 PHONE:4252682298 <br /> TAX PARCEL ID#:00393900501000 SITE ADDRESS:8208 FLORIDA DR <br /> DESCRIPTION: FILL MATERIAL,GRAVEL,AND OTHER HARD SURFACES TO BE REMOVED <br /> FROM THE WETLAND BUFFER. NATIVE PLANS WILL BE INSTALLED. <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications <br /> for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works Department dated 07/25/2022. <br /> Approved plans must remain on job-site at all times. <br /> 5. It is the applicant/contractor's responsibility to ensure coverage under Ecology's Construction Stormwater General Permit is obtained and <br /> maintained throughout the entire construction duration. <br /> 6. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all <br /> required inspections.An Inspection Handout is provided at permit issuance with instructions on how to request an inspection online. This <br /> project will require additional Planning Department Inspections in addition to the Public Works Inspections. <br /> 7. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br /> SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 8. Keep City streets clean at all times. No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 9. Protect all existing underground utilities(to remain)during construction. <br /> 10.All excavated material shall be hauled to an approved,permitted site. <br /> 11.Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a haul route will be required to be submitted to <br /> the City of Everett prior to permit issuance.Contact the Traffic Engineering Department for Street Use Permits and any required Oversize <br /> Load Permits at 425-257-8810(press Option 7 for Traffic). <br /> Public Works Permit Fee Breakdown: 0 <br /> Erosion Control $50.00118 a uzil <br /> D <br /> Grade/Fill/Excavate(190 CY) $70.00 <br /> PW Plan Review $20.00 AUG 0 2022 <br /> PW Site Inspection $20.00 AUG 0 4 2022 <br /> CITY OF EVERETT CITE, <br /> Permit Services Off' EVERETT <br /> Permit Services <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant <br /> hereby agrees to hold and save harmless the City of Everett from any <br /> and all claims for damages,costs,expenses,or causes of action that <br /> n n/ may arise because of installation and maintenance of the <br /> /7Kl/ YIPttote tt 07/25/2022 improvement or other right-of-way use here to applied for and further <br /> agrees to remove same upon notice from the City and to replace <br /> Approved for Construction, Public Works Dept. Date public property damaged thereby. <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 180 DAYS TO KEEP THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> _APPLICANT/JOB SITE COPY TREASURER ADDRESS FILE <br />
The URL can be used to link to this page
Your browser does not support the video tag.