My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services 2/16/2024
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Always Active Services 2/16/2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 2:48:16 PM
Creation date
2/16/2024 2:47:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services
Approval Date
2/16/2024
Council Approval Date
11/29/2023
Department
Public Works
Department Project Manager
Christina Curtis
Subject / Project Title
Citywide Bicycle Wayfinding Project
Tracking Number
0004034
Total Compensation
$363,113.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
1 <br />CITY OF EVERETT, WASHINGTON <br />CONTRACT <br />THIS CONTRACT is made and entered into by and between the City of Everett, Washington, a municipal corporation existing under the laws of the State of Washington (the “City”) and Always Active Services LLC, a Washington limited liability company (the “Contractor”). <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to furnish all labor, tools, materials, equipment, and supplies required to complete in a workmanlike manner the work, improvements, and appurtenances in accordance with the Specifications and Plans and all other Contract Documents entitled: “CITYWIDE BICYCLE WAYFINDING” (the “Project”). <br />1.Contract Documents. The following documents (“Contract Documents”) are incorporated byreference and are hereby made a part of this Contract: <br />A.Notice to Contractors <br />B.Instructions to Bidders <br />C.Washington State Department of Transportation Standard Specifications 2023 as modified byall amendments thereto as of the date of bid opening of this Project (“StandardSpecifications”). <br />D.Contract Provisions, including without limitation the Special Provisions <br />E.Plans, Drawings and Project Specifications <br />F.Addenda (if any) <br />G.Performance Bond and Payment Bond <br />H.Contractor’s Proposal/Bid (dated 10/23/2023 and copy attached hereto) <br />I.All provisions required by law whether set forth and reproduced herein or not. <br />J.Disadvantaged Business Enterprise (DBE) utilization certification. <br />A copy of the Contract Documents that were posted for the Project on Builder’s Exchange of Washington (www.bxwa.com) as of Bid Opening Date is maintained by the City Clerk’s Office as a single pdf and is available as follows: <br />Link to PDF <br />https://lfportal.everettwa.gov/WebLink/DocView.aspx?id=1602525&searchid=e6fea426-6dbf-4916-88ab-4ea34610c50e&dbid=0. <br />This is a 408-page pdf digitally signed by City of Everett 2023.11.27 11:37:28-08’00’ <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to signing this Contract. City and Contractor agree that this pdf contains all posted Contract Documents as of the Bid Opening Date. City and Contractor further agree that this pdf may contain some other documents (such as Reference Information) that are not Contract Documents.
The URL can be used to link to this page
Your browser does not support the video tag.