Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers.All questions shall be routed through this project's Public Works <br /> Reviewer Abiy Tsegaye with City of Everett Permit Services (ATsegaye@everettwa.gov). <br /> # Document Sht/Pg Reviewer's Comment Designer's Response Initials <br /> 1 Civil Plans — The site plan needs to be updated to match the most current <br /> Architectural Plans submitted for the building permit (driveway <br /> width is reduced to 30ft) <br /> The site plan should show all site work including: <br /> • required stormwater management BMPs per completed <br /> report(location of dispersion BMP, Post-construction soil <br /> quality area, etc.) • <br /> • Utility connections and sizes with the applicable <br /> standards <br /> Provide Temporary Erosion and Sediment Control Plan <br /> (See COE Standard plans 101-104 for reference) <br /> 1 Report - The small project stormwater site plan/report needs corrections: <br /> • Worksheet 3 BMP sizing is inconsistent with the BMP <br /> selected in Task 3 List#1. Is the stormwater managed <br /> using dispersion or infiltration? Please fill the applicable <br /> BMP and show on the site plan. <br /> S <br /> Page 2 of 2 <br />