My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W BLDG B 2022 SOUNDVIEW EVERETT Plans 2024-06-07
>
Address Records
>
36TH AVE W
>
5900
>
SOUNDVIEW EVERETT
>
Plans
>
5900 36TH AVE W BLDG B 2022 SOUNDVIEW EVERETT Plans 2024-06-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2024 8:00:04 AM
Creation date
2/20/2024 1:42:35 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Unit
BLDG B
Tenant Name
SOUNDVIEW EVERETT
Permit
M2211-031
Year
2022
Notes
MECHANICAL WORK FOR BLDG B PER PLANS
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIFICATIONS -ALL MODELS <br /> `!IV DINE <br /> G.5.c. The motor shall be provided with an adjustable motor J.26. A 230V to 115V step down shall be provided for <br /> sheave to allow for minor adjustment of the blower rpm operation of the 115V power exhauster and control <br /> at the job site. (BTC models) circuit. (BTC models) <br /> G.5.d. The blower shall be a double width,double inlet J.27. A 460V to 115V step down shall be provided for <br /> (DWDI),forward curved,belt driven,assembly with spider operation of the 115V power exhauster and control <br /> ball bearings.(BTC models) circuit. (BTC models) <br /> J.28. A 575V to 115V step down shall be provided for <br /> H.Mounting operation of the 115V power exhauster and control <br /> circuit. (BTC models) <br /> H.1. The unit shall be equipped with tapped holes to accept <br /> 3/8"-16 threaded rod for suspension. J.29. A horizontal concentric vent kit shall be provided to <br /> allow the vent outlet and combustion air inlet pipes to <br /> H.1.a. The unit shall be equipped with mounting brackets to penetrate the building wall through one opening. <br /> allow for threaded rod suspension or to be bolted <br /> directly to the ceiling support structure allowing 1"of J.30. A vertical concentric vent kit shall be provided to allow <br /> top clearance. (PTC models-opt on sizes 55-110) the vent outlet and combustion air inlet pipes to <br /> penetrate the building roof through one opening. <br /> H.3. Propeller unit to have 4 suspension points. <br /> J.31. A 2-point suspension kit to convert the unit from 4-point <br /> H.4. Blower unit to have 6 suspension points. mounting to 2-point mounting. <br /> J.32. An Energy Saver Thermostat to be mounted high and <br /> J.Accessories independent of the room stat to turn on the unit heater <br /> The following field installed accessory control devices shall be fan if high temperatures are sensed,forcing the heated <br /> provided with the unit: air down to reduce stratification and gas usage. <br /> J.1. A 1/2-50 psi gas pressure regulator to reduce the inlet J.33. A condensate pump for high lift applications of up to 22'. <br /> gas pressure for the operating controls. Pump shall include indicator lights to show pump status, <br /> internal vibration isolation, a check valve, condensate <br /> J.2. A clear plastic thermostat guard with two keys for room treatment tablet dispenser, and alarm contacts to shut <br /> thermostats. the unit heater down if the pump becomes inoperable. <br /> J.4. Pipe Hanger Adapter Kit to facilitate threaded pipe J.34. A condensate pump suspension kit to suspend/support <br /> suspension. the pump(DiversiTech CP-22)from the unit heater. <br /> J.7. Vertical Deflector Kit to enables side distribution of J.35. Condensate treatment tablets to controls slime growth in <br /> airflow. pump(DiversiTech CP-22)and downstream drain. <br /> J.8. A blower enclosure fully encloses blower to enable the J.36. A condensate pH neutralizing kit to reduce the acidity of <br /> attachment of filter racks and/or duct. condensate. Includes barbed inlet and outlet fittings, <br /> J.9. A combination filter rack/duct connector containing a 1" mounting brackets and an initial charge of neutralizing <br /> thick,cleanable filter. aggregate. <br /> J.11. A belt guard enclosing the belts and sheaves(pulleys) J.37. A recharge kit for pH neutralizing kit. Includes sufficient <br /> on a blower type unit heater. (BTC models) aggregate for a complete recharge of the neutralizing kit. <br /> J.12. Propane conversion kit for converting natural gas units <br /> to propane gas. K.Thermostats <br /> J.17. Discharge transition from unit to polytube. (BTC models) The unit shall be provided with the following thermostat: <br /> J.18. 30°non-velocity generating downward air deflector hood K.2. A single stage room thermostat with a 50°-90°F range. <br /> constructed of 20 ga. cold rolled steel with baked-on K.3. A single stage room thermostat with a 50*-90°F range <br /> gray-green polyester powder paint. with Heat/Off/Cool and Fan On/Auto switching. <br /> J.19. 60°non-velocity generating downward air deflector hood K.4. Honeywell TH5220D1029 digital non-programmable <br /> constructed of 20 ga.cold rolled steel with baked-on room stat with switching-range 40-90°F. <br /> gray-green polyester powder paint. <br /> J.20. 90°non-velocity generating downward air deflector hood K.5. A field installed two-stage duct thermostat with a <br /> constructed of 20 ga.cold rolled steel with baked-on 0*-100°F range and 20-foot capillary. <br /> gray-green polyester powder paint. K.6. A two-stage electronic duct thermostat with field <br /> J21. A 208V to 115V step down shall be provided for installed temperature sensor,temperature selector and <br /> operation of the 115V unit. (PTC models) one stage adder. <br /> J.22. A 230V to 115V step down shall be provided for <br /> operation of the 115V unit.(PTC models) <br /> J.23 A 460V to 115V step down shall be provided for <br /> operation of the 115V unit.(PTC models) <br /> J.24. A 575V to 115V step down shall be provided for <br /> operation of the 115V unit. (PTC models) <br /> J.25. A 208V to 115V step down shall be provided for <br /> operation of the 115V power exhauster and control <br /> circuit. (BTC models) <br /> 18 6-170.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.