Laserfiche WebLink
VERETT <br />0 <br />Permit Number: M2209-028 <br />Applied: 9/13/2022 <br />Issued: 9/21/2022 <br />Status: FINALED <br />Parent Permit: <br />Parent Project: <br />Permit Inspections <br />City of Everett <br />Approved:9/15/2022 <br />Finaled: 7/27/2023 <br />Description: Installation of Garage Space Heater (Mechanical Permit) <br />Site Address: 2729 104TH PL SE <br />City, State Zip Code: EVERETT, WA 98208 <br />Applicant: Walter White <br />Owner: Walter White <br />Contractor: OWNER <br />Details: <br />I will be procuring and installing all of the components for this task. My estimated flow time for completion is December 22, 2022, <br />depending on part availability and permit arrival process time. This space heater contains a circulation fan (120v AC), therefore I also <br />have an Electrical Permit request being processed. <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />12/2/2022 <br />12/2/2022 <br />MECH 06-FINAL <br />MASON <br />CORRECTION <br />see notes <br />MORRISSEY <br />REQUIRED <br />Notes: <br />11/27/2022 11:29 AM Walter White <br />Garage natural gas heater installation complete. <br />Contact Name: Walter White <br />Site Address: 2729 104TH PL SE <br />Phone:4255204111 <br />e-Mail: w3Leon@gmail.com <br />- Common venting is undersized for the addition of garage heater. Run vent to exterior separately and per manufacturers instructions.- Make sure pro <br />flex gas piping is sized appropriately for gas run.- Proper combustion clearances are met per manufacturer. <br />- Common venting is undersized for the addition of garage heater. Run vent to exterior separately and per manufacturers instructions.- Make sure pro <br />flex gas piping is sized appropriately for gas run.- Proper combustion clearances are met per manufacturer. <br />2/7/2023 <br />2/7/2023 <br />MECH 06-FINAL <br />MASON <br />CORRECTION <br />see notes <br />MORRISSEY <br />REQUIRED <br />Notes: <br />2/3/2023 8:10 AM Walter White <br />Relocated garage space heater. <br />Contact Name: Walter White <br />Site Address: 2729 104TH PL SE <br />Phone:4255204111 <br />e-Mail: w3Leon@gmail.com <br />- Per the IFGC 506.3.5 Type B & L gas vent termination. Need to terminate garage heater exhaust at least 2' above highest portion of building/roof <br />located within 8 feet. <br />I <br />Printed: Wednesday, 21 February, 2024 1 of 2 rk <br />SUPERION <br />