My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024/02/14 Council Agenda Packet
>
Council Agenda Packets
>
2024
>
2024/02/14 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2024 4:33:56 PM
Creation date
2/21/2024 10:27:06 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/14/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City Council Agenda Item Cover Sheet <br /> <br />Project title: <br />An Ordinance creating a special improvement project entitled “Edgewater Creek Bridge <br />Replacement” Fund 303, Program 115, to accumulate all costs for the improvement and <br />repealing Ordinance No. 3719-19. <br />Council Bill # <br />CB 2401-78 <br />Consideration: Plans & Systems Ordinance <br />Project: Edgewater Creek Bridge Replacement <br />Partner/Supplier: WA State Department of Transportation <br /> Location: Mukilteo Boulevard at Shore Avenue <br />Preceding action: City Ordinance No. 3719-19, approved 12/18/19 <br />Fund: Fund 303, Program 115 <br />Agenda dates requested: <br />2/7/24, 2/14/24 & 2/21/24 <br />Briefing <br />Proposed action <br />Consent <br />Action <br />Ordinance X <br />Public hearing <br />Yes X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Proposed Ordinance <br />Department(s) involved: <br />Public Works, Admin <br />Contact person: <br />Tom Hood <br />Phone number: <br />(425)257-8809 <br />Email: <br />thood@everettwa.gov <br />Initialed by: <br />RLS <br />Department head <br />Administration <br />Council President <br />Fiscal summary statement: <br />The programmed available funding for this project is $34,000,000 and the sources of <br />funds are: <br />Bridge Program – Federal Funds $ 25,000,000 <br />DEMO Grant #WA329 3,000,000 <br />Fund 157 – Traffic Mitigation 6,000,000 <br />Total Funds $ 34,000,000 <br />This amending ordinance, increasing the project’s programed available funding, is <br />necessary to reflect increased grant funds and escalating construction costs. Public <br />Works staff were successful in obtaining an increase in Federal bridge funding from the <br />original $12.0 million to $25.0 million as well as an additional $3.0 million DEMO grant. <br />Project summary statement: <br />This project will remove and replace the existing Edgewater Creek Bridge, which was <br />built in 1946 and is a vital link in a chain of three bridges that provide the only access to <br />neighborhoods along Mukilteo Boulevard. <br />The existing bridge is a non-redundant two girder composite deck concrete structure <br />that is structurally deficient in load capacity. In addition, the bridge is seismically <br />vulnerable and functionally obsolete due to narrow substandard traffic lanes and <br />sidewalks. <br />Recommendation (exact action requested of Council): <br />Adopt an Ordinance creating a Special Improvement Project entitled “Edgewater Creek <br />Bridge Replacement” Fund 303, Program 115, to accumulate all costs for the <br />improvement and repealing Ordinance No. 3719-19.
The URL can be used to link to this page
Your browser does not support the video tag.