Laserfiche WebLink
Heat Pumps <br />Tag <br />Make <br />Model <br />Cooling Cap. <br />Heating Cap. <br />CFM <br />Voltage <br />Phase <br />Max fuse <br />SR/HSPF <br />OU-1 <br />Daikin <br />3MXS24RMVJUA <br />24.000 <br />24,000 <br />NA <br />208 <br />1 <br />25A <br />18/12.5 <br />IU-1 <br />Daikin <br />FTXS09LVJU <br />9,000 <br />9,000 <br />420 <br />208 <br />1 <br />NA <br />NA <br />IU-2 <br />Daikin <br />FTXS18LVJU <br />18,000 <br />18,000 <br />431 <br />208 <br />1 <br />NA <br />NA <br />City of Everett Animal Shelter <br />DARRON <br />SIZE <br />D.K. Systems, Inc. <br />PO Box 886 <br />Notes: <br />1.) Mount OU-1 on SUMO feet and run angle 2"x2" 24ga brace from unit housing back to building to provide <br />seismic restraint. Consider placement of OU-1 so it does not conflict with cars negotiating coming and going from <br />parking spaces. <br />2.) Run refrigeration lines, condensate lines and electrical in line hide. Coordinate with City's electrician so they can <br />get their cable installed within line hide cover. <br />3.) Fresh air is being provided to rooms 112 and 111 by existing VAV box fed by HRV (heat recovery ventilator). <br />4.) Mechanical permit needed and electrical permit for two thermostat circuits. <br />5.) City will provide high voltage wiring and permit for this project. <br />6.) Coordinate exact location of indoor units with office staff so that air is not blowing directly on patient in surgery <br />area. <br />A DEG= 2 <br />REV <br />DRAWN <br />(ISSUED Tuesday, September 19, 2023 (SCALE <br />Burlinaton. WA 982 <br />3/16" = V-0" <br />Floor Plan <br />SHEET <br />20F2 <br />