My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1802 75TH ST SW 2024-03-05
>
Address Records
>
75TH ST SW
>
1802
>
1802 75TH ST SW 2024-03-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 7:49:32 AM
Creation date
2/24/2024 8:48:31 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1802
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 5/4/2023 <br />City of Everett Permit Services Public Works Permit #: PW2305-002 <br />3200 Cedar Street, 2nd Floor Associated Bldg Permit #: <br />EV E R E T T Everett, WA 98201 Planning Reference #: <br />everettwa.gov/permits Public Works Fee: $65.00 <br />WASHINGTON PermitServices@everettwa.gov Schedule Inspections at: onlinepermits.everettwa.gov <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />PUBLIC UTILITY DIST 1 SNO CO KASEY WESTFALL <br />2320 CALIFORNIA <br />EVERETT, WA 98201 <br />PHONE: PHONE: 4257585963 <br />SITE ADDRESS: 1802 75TH ST SW TAX PARCEL ID #: 00392200000300 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: REPLACE EXISTING NORTH VEHICLE ENTRY GATE WITH NEW <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov. Available inspection dates are shown in the dropdown menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications for <br />Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department. Approved plans must remain on job -site at all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally request <br />all required inspections. <br />6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br />SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW Inspector. <br />10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on -site in a <br />manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the improvements located <br />therein. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained from the <br />City's Traffic Engineering Division. This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic control plan to be <br />submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />12. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting PW 25- <br />Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br />13. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires use of the right- <br />of-way for municipal purposes. <br />PERMIT FEE BREAKDOWN: <br />Misc. Minor Permits (Automated Gate) ................................ $25.00 <br />PW Plan Review..................................................................... $20.00 <br />PW Site Inspection................................................................ $20.00 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and <br />all claims for damages, costs, expenses, or causes of action that may arise because of installation and maintenance of the improvement or other <br />right-of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged <br />thereby. <br />VALIDITY/EXPIRATION: <br />Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. <br />This permit may be canceled by the city upon any stoppage of work on this project over 180-day duration. Each inspection extends the expiration <br />date 180 days to keep the permit open while work is active. <br />Page 1 of 1 <br />APPLICANT/JOB SITE COPY ADDRESS FILE TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.