Laserfiche WebLink
2022 Stormwater System Development Fee Calculations <br /> Permit M PW2211-016 Additional Notes: <br /> Project Address: 3302 18TH ST Stormwater system development fees split on two separate permits:ground hard surfaces <br /> Project Name: DOG PARK(FENCE AND PAVEMENT) calculated on Public Works Permit and roof hard surfaces calculated on Building Permit. <br /> Answer the Following Questions(Required):All Yellow Inputs <br /> Water District: Everett <br /> Sewer District: Everett Prepared By: Abiy Tsegaye Date: 3/29/2023 <br /> Outside City Limits? No *Adds a 25%Surcharge <br /> Supportive Housing Credit? INo *Reduces by 80% 1 Reviewed By: Date: <br /> Fee Calculations: <br /> Stormwater System Development Fees: <br /> Permit#: BXXXX-XX Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: I SF <br /> Stormwater System Dev Fee: $0.00 Add this fee to the Building Permit for roof area hard surfaces. <br /> Stormwater System Development Fees: <br /> Permit#: PW2211-016 Type of Construction: Existing Development Adding New+Replaced Hard Surfaces <br /> Square Feet of New Plus Replaced Hard Surfaces: 144 SF <br /> Stormwater System Dev Fee: $38.56 Add this fee to the Public Works Permit for hard surfaces on the ground. <br />