My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9610 19TH AVE SE 2024-03-05
>
Address Records
>
19TH AVE SE
>
9610
>
9610 19TH AVE SE 2024-03-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 11:29:08 AM
Creation date
2/24/2024 9:30:34 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9610
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 11/12/2022 <br />City of Everett Permit Services Public Works Permit #: PW2211-011 <br />3200 Cedar Street, 211 Floor Associated Bldg Permit #: #: <br />E V E R E T T <br />Everett, WA 98201 Planning Reference #: <br />WASHINGTON everettwa.gov/permits Public Works Fee: $65.00 <br />Perm itSeryices@eve rettwa.goy Schedule Inspections at: onlinepermits.everettwa.gov <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />PREMIER STORAGE EVERETT LLC SARAH HULL <br />5729 LAKEVIEW DR NE STE 200 <br />KIRKLAND, WA 98033 <br />PHONE: PHONE: 2063720516 <br />SITE ADDRESS: 9610 19TH AVE SE TAX PARCEL ID #: 28051800406500 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: INSTALL 17X30 VAULT AS PULL BOX/ TRENCHING FOR CELL SITE <br />NOTES: <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at https://onlinepermits.eyerettwa.goy. Available inspection dates are shown in the dropdown <br />menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications <br />for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department. Approved plans must remain on job -site at <br />all times. <br />5. Inspections are required for all stages of construction. Visit the City's Online Permitting Portal at onlinepermits.everettwa.gov to formally <br />request all required inspections. A handout is provided at permit issuance with instructions on how to request an inspection online. <br />6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br />SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br />7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto roadway. <br />8. Protect all existing underground utilities during construction. <br />9. Any damage to City improvements (sidewalk, curb, roadway, etc.) shall be replaced per City Standards and/or as directed by the City PW <br />Inspector. <br />10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on - <br />site in a manner that does not adversely affect neighboring properties, including the City's right-of-way and/or easements and the <br />improvements located therein. <br />11. Prior to any interruption to the public right-of-way (roadways, parking lanes, or sidewalks) a Traffic Street Use permit shall be obtained <br />from the City's Traffic Engineering Division. This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br />control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br />12. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by <br />selecting PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br />complete <br />Public Works Permit Fee Breakdown: <br />Misc. Minor Permits (Drainage Work) ....... ..... $25.00 <br />PW Plan Review ....................................... ....... $20.00 <br />PW Site Inspection..........................................$20.00 <br />IeT�13► NPJI ���Zh���il�► ���IY�L�I► U7� �[�7►1.� <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all <br />claims for damages, costs, expenses, or causes of action that may arise because of installation and maintenance of the improvement or other right- <br />of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br />VALIDITY/EXPIRATION: <br />Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. This <br />permit may be canceled by the city upon any stoppage of work on this project over 180-day duration. Each inspection extends the expiration date <br />180 days to keep the permit open while work is active. <br />Page 1 of 1 <br />_APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.