Laserfiche WebLink
(E) ZIPLY CABINET <br />WITH FDP <br />■■ 14� kv <br />.. (N) POE ■■ <br />11111rtiiitilllelltl!ll1NH11111111 <br />Al; <br />GENERAL <br />I j DIESEL 1'd <br />FUFI GAllUO! <br />di/i� �►'` [1NIY CAPp.CITY �.�.z <br />MEET POINT - VZW GC TO SUPPLY I <br />AND INSTALL (1) (N)1730-TA HH, <br />WITHIN 3' OF (N) ZIPLY CABINET. <br />VZW GC TO SUPPLY AND INSTALL (1) 4" <br />SCH 40 PVC CONDUIT FROM THE MEET <br />POINT (VZW HH) TO THE ZIPLY CABINET. <br />APPROX 4' CONDUIT TO CONTAIN (3) <br />1.25" INNERDUCT WITH PULL TAPE, ONE <br />OF WHICH TO BE CLEARLY LABELED FOR <br />ZIPLY USE. CONDUIT TO BE STUBBED <br />AND CAPPED NEXT TO ZIPLY CABINET. <br />VZW GC TO SUPPLY AND <br />INSTALL (1) (N) 4" SCH 80 PVC <br />CONDUIT BETWEEN THE MEET <br />POINT TO THE (N) POE ON THE <br />(E)) VZW SHELTER. APPROX 25' <br />