Laserfiche WebLink
PUBLIC WORKS PERMIT <br />City of Everett Permit Services <br />E V E R E T T 3200EveCedar <br />rett, WA 98201 Floor <br />WASHINGTON ever ettwd.KOy/permits <br />PermitServices@everettwa.gov <br />OWNER NAME AND ADDRESS: <br />SAKS HOLDINGS LLC <br />3518 210TH PL SE <br />BOTHELL, WA 98021 <br />PHONE: <br />Date Applied: 11/1/2022 <br />Public Works Permit #: PW2211-003 <br />Associated Bldg Permit #: #: <br />Planning Reference #: <br />Public Works Fee: $0 <br />Schedule Inspections at: onlinepermits.everettwa.Kov <br />APPLICANT NAME AND ADDRESS: <br />ELIZABETH SCHELLER <br />PHONE: 2065717716 <br />SITE ADDRESS: 11200 EVERGREEN WAY TAX PARCEL ID #: 00442900400100 <br />THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br />DESCRIPTION: INSTALL AND SAMPLE (2) GROUNDWATER MONITORING WELLS IN ROW <br />NOTES: <br />PERMIT CONDITIONS: <br />1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov. Available inspection dates are shown in the dropdown <br />menu. <br />2. All work shall be performed in accordance with the permit and current City of Everett 'Design and Construction Standards and Specifications <br />for Development'. <br />3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br />ACKNOWLEDGEMENT OF CONDITIONS <br />By purchasing this permit and commencing work, the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all <br />claims for damages, costs, expenses, or causes of action that may arise because of installation and maintenance of the improvement or other right- <br />of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br />VALIDITY/EXPIRATION: <br />Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion. This <br />permit may be canceled by the city upon any stoppage of work on this project over 180-day duration. Each inspection extends the expiration date <br />180 days to keep the permit open while work is active. <br />Page 1 of 1 <br />_APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />