Laserfiche WebLink
MWL ROADS — PHASE 1 STORMWATER REPORT <br />PORT OF EVERETT PND Project No. 154016-018.01 <br />1.1. TABLE OF CONTENTS <br />1.1. TABLE OF CONTENTS............................................................................................................................... i <br />2. INTRODUCTION...................................................................................................................................................1 <br />2.1. TEMP ACCESS AND SITE PREP.............................................................................................................1 <br />2.2. TEMP ACCESS AND SITE PREP.............................................................................................................1 <br />2.3. PRELOAD CONSRUCTI0N......................................................................................................................1 <br />2.4. UTILITIES........................................................................................................................................................1 <br />2.5. STORMWATER..............................................................................................................................................1 <br />3. PROJECT DESCRIPTION.................................................................................................................................... 3 <br />3.1. EXISTING CONDITIONS.......................................................................................................................... 3 <br />3.2. PROPOSED CONDITIONS....................................................................................................................... 3 <br />4. CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN ........................................... 4 <br />5. HYDROLOGY.........................................................................................................................................................4 <br />6. PERMANENT STORMWATER CONTROL PLAN...................................................................................... 4 <br />7. OFFSITE ANALYSIS............................................................................................................................................. 4 <br />8. MINIMUM REQUIREMENTS............................................................................................................................ 4 <br />8.1. MR #1 — Preparation of Stormwater Site Plan............................................................................................ 6 <br />8.2. MR #2 — Construction stormwater Pollution Prevention Plan (SWPPP).............................................. 6 <br />8.3. MR #3 — Source Control of Pollution.......................................................................................................... 6 <br />8.4. MR #4 — Preservation of Natural Drainage Systems and Outfalls.......................................................... 6 <br />8.5. MR #5 — On -Site Stormwater Management................................................................................................ 7 <br />8.6. MR #6 — Runoff Treatment........................................................................................................................... 7 <br />8.7. MR #7 — Flow Control.................................................................................................................................... 7 <br />8.8. MR #8 — Wetlands Protection....................................................................................................................... 7 <br />8.9. MR #9 — Operation and Maintenance.......................................................................................................... 7 <br />FIGURES <br />Figure 1-1: Vicinity Map <br />Figure 7-1: Minimum Requirements for Redevelopment Project <br />Figure 7-3: Runoff Treatment BMP Selection <br />