Laserfiche WebLink
Element 2: Establish Construction Access (2.1.2) <br />The site is already highly developed and surrounded by asphalt. A construction entrance shall be <br />constructed and utilized for construction traffic. Should the construction entrance prove ineffective at <br />preventing tracking sediment onto roads, a Wheel Wash will be installed. <br />List and describe BMPs: <br />BMP C106: Wheel Wash <br />Installation Schedules: Construction Entrance — Shall be installed at the beginning <br />of construction and maintained for the duration of the <br />project. <br />Wheel Wash — Shall be installed at the direction of the <br />CESCL should the construction entrance provide <br />ineffective at preventing tacking sediment onto roads. <br />Inspection and Maintenance plan: Inspection and maintenance shall be performed per BMP <br />Guidelines in the SWMMWW. <br />Responsible Staff: CESCL JBD by Contractor) <br />