Laserfiche WebLink
Element 6: Protect Slopes (2.1.6) <br />All cut and fill slopes will be constructed and protected in accordance with construction best <br />practices to minimize erosion. Exposed soils on slopes will be protected with Plastic Covering <br />(BMP C123) or alternatively with Temporary and Permanent Seeding (BMP C120) and/or Nets <br />and Blankets (BMP C122). <br />Will steep slopes be present at the site during construction? No <br />List and describe BMPs: Plastic Covering (BMP C123); <br />Installation Schedules: <br />Inspection and Maintenance plan <br />Temporary and Permanent Seeding (BMP C120); <br />Mulching (BMP C121); <br />Nets and Blankets (BMP C122) <br />Install prior to land -disturbing activities. <br />Inspection and Maintenance to be performed per <br />BMP guidelines and manufacturers' <br />recommendations. <br />Responsible Staff: CECSL <br />