My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 14TH ST 2024-03-01
>
Address Records
>
14TH ST
>
1001
>
1001 14TH ST 2024-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 2:31:55 PM
Creation date
2/24/2024 10:01:33 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring and Sampling Requirements (4.0) <br />The project land -disturbing activity area is over 1-acre. As such, the project will be applying for a <br />construction stormwater general permit (CSWGP). Monitoring and Sampling for this project will <br />comply with the CSWGP. <br />Monitoring includes visual inspection, sampling for water quality parameters of concern, and <br />documentation of the inspection and sampling findings in a site log book. A site log book will be <br />maintained for all on -site construction activities and will include: <br />• A record of the implementation of the SWPPP and other permit requirements <br />• Site inspections <br />• Stormwater sampling data <br />The site log book must be maintained on -site within reasonable access to the site and be made <br />available upon request to Ecology or the local jurisdiction. <br />Monitoring and sampling for discharge to the COE sewer system will be provided in accordance <br />with all applicable COE standards. <br />Monitoring and sampling requirements for contaminants shall be in accordance with the <br />Contamination Contingency Plan in Appendix G. <br />Site Inspection (4.1) <br />Site inspections will be conducted at least once every calendar week and within 24 hours <br />following any discharge from the site. For sites that are temporarily stabilized and inactive, the <br />required frequency is reduced to once per calendar month. <br />The discharge point(s) are indicated on the Site Map (see Appendix A) and in accordance with <br />the applicable requirements of the CSWGP. <br />Stormwater Quality Sampling (4.2) <br />Stormwater Quality Sampling will be in accordance with the City of Everett discharge permit <br />requirements. <br />Turbidity Sampling (4.2.1) <br />All construction stormwater will be discharged to the sanitary sewer. Discharge to sewer will be <br />in accordance with all City standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.