Laserfiche WebLink
Monitoring and Sampling Requirements (4.0) <br />The project land -disturbing activity area is over 1-acre. As such, the project will be applying for a <br />construction stormwater general permit (CSWGP). Monitoring and Sampling for this project will <br />comply with the CSWGP. <br />Monitoring includes visual inspection, sampling for water quality parameters of concern, and <br />documentation of the inspection and sampling findings in a site log book. A site log book will be <br />maintained for all on -site construction activities and will include: <br />• A record of the implementation of the SWPPP and other permit requirements <br />• Site inspections <br />• Stormwater sampling data <br />The site log book must be maintained on -site within reasonable access to the site and be made <br />available upon request to Ecology or the local jurisdiction. <br />Monitoring and sampling for discharge to the COE sewer system will be provided in accordance <br />with all applicable COE standards. <br />Monitoring and sampling requirements for contaminants shall be in accordance with the <br />Contamination Contingency Plan in Appendix G. <br />Site Inspection (4.1) <br />Site inspections will be conducted at least once every calendar week and within 24 hours <br />following any discharge from the site. For sites that are temporarily stabilized and inactive, the <br />required frequency is reduced to once per calendar month. <br />The discharge point(s) are indicated on the Site Map (see Appendix A) and in accordance with <br />the applicable requirements of the CSWGP. <br />Stormwater Quality Sampling (4.2) <br />Stormwater Quality Sampling will be in accordance with the City of Everett discharge permit <br />requirements. <br />Turbidity Sampling (4.2.1) <br />All construction stormwater will be discharged to the sanitary sewer. Discharge to sewer will be <br />in accordance with all City standards. <br />