My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 14TH ST 2024-03-01
>
Address Records
>
14TH ST
>
1001
>
1001 14TH ST 2024-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 2:31:55 PM
Creation date
2/24/2024 10:01:33 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II-3 Construction Stormwater BMPs <br />11-3.1 A Summary of Construction Stormwater <br />BMPs <br />This chapter contains standards and specifications for temporary BMPs, used as appropriate during <br />the construction phase of a project. Often using BMPs in combination is the best method to meet <br />Construction Stormwater Pollution Prevention Plan (Construction SWPPP) requirements. <br />The standards and specifications in this chapter are not intended to limit innovative efforts to effect- <br />ively control erosion and sedimentation. Construction SWPPPs can contain experimental BMPs or <br />make minor modifications to standard BMPs. However, the permitting authority (state, local, or both) <br />must approve such practices before use. Experimental and modified BMPs must achieve the same <br />or better performance than the BMPs listed below. <br />None of the BMPs listed below will work successfully throughout the construction project without <br />inspection and maintenance. Regular inspections to identify problems with the operation of each <br />BMP, and the timely repair of any problems are essential to the continued operation of the BMPs. As <br />site conditions change, BMPs must change to remain in compliance. <br />Construction stormwater BMPs are divided into two categories: Construction Source Control BMPs <br />and Construction Runoff BMPs. <br />Table II-3.1: Construction Stormwater BMPs by SWPPP Element shows the relationship of the Con- <br />struction Stormwater BMPs to the Construction SWPPP Elements described in 1-3.4.2 MR2: Con- <br />struction Stormwater Pollution Prevention Plan (SWPPP). <br />Table II-3.1: Construction Stormwater BMPs by SWPPP Element <br />Construction Storm- <br />water BMP <br />Construction SWPPP Element # <br />#1 <br />#2 <br />#3 <br />#4 <br />#5 <br />#6 <br />#7 <br />#8 <br />#9 <br />#10 <br />#11 <br />#12 <br />#13 <br />Construction Source Control BMPs <br />BMP C101: Preserving <br />Natural Vegetation <br />BMP C102: Buffer <br />Zones <br />BMP C103: High -Vis- <br />V <br />V <br />ibility Fence <br />BMP C105: Stabilized <br />✓ <br />Construction Access <br />C106: Wheel <br />Wash <br />✓ <br />2019 Stormwater Management Manual for Western Washington <br />Volume 11- Chapter 3 - Page 267 <br />
The URL can be used to link to this page
Your browser does not support the video tag.