Laserfiche WebLink
SHEETINDEX <br />DWG NO. REV. NO. SHEET NO. I SHEET NAME <br />TITLE <br />T1.01 1 1 TITLE SHEET <br />GENERAL <br />31.01 <br />4 <br />2 <br />SHEETINDEX <br />G1.02 <br />1 <br />3 <br />GENERAL SYMBOLS <br />G1.03 <br />1 <br />4 <br />GENERAL ABBREVIATIONS <br />31.04 <br />2 <br />5 <br />ALIGNMENT PLAN <br />G1.05 <br />1 <br />6 <br />OVERALL SITE AND EMERGENCY ACCESS PLAN <br />G2.00 <br />1 <br />7 <br />SITE TOPOGRAPHIC SURVEY KEY PLAN <br />G2.01 <br />1 <br />8 <br />SITE TOPOGRAPHIC SURVEY <br />G2.02 <br />1 <br />9 <br />SITE TOPOGRAPHIC SURVEY <br />G2.03 <br />1 <br />10 <br />SITE TOPOGRAPHIC SURVEY <br />G2.04 <br />1 <br />11 <br />SITE TOPOGRAPHIC SURVEY <br />G2.05 <br />1 <br />12 <br />SITE TOPOGRAPHIC SURVEY <br />G2.06 <br />1 <br />13 <br />SITE TOPOGRAPHIC SURVEY <br />G2.07 <br />1 <br />14 <br />SITE TOPOGRAPHIC SURVEY <br />G2.08 <br />1 <br />15 <br />SITE TOPOGRAPHIC SURVEY <br />G2.09 <br />1 <br />1 16 <br />ISITE TOPOGRAPHIC SURVEY <br />DEMOLITION & EROSION CONTROL <br />D1.00 <br />1 <br />17 <br />DEMOLITION KEY PLAN <br />D1.01 <br />1 <br />18 <br />DEMOLITION PLAN <br />D1.02 <br />1 <br />19 <br />DEMOLITION PLAN <br />D1.03 <br />1 <br />20 <br />DEMOLITION PLAN <br />D1.04 <br />1 <br />21 <br />DEMOLITION PLAN <br />D1.05 <br />2 <br />22 <br />DEMOLITION PLAN <br />D1.06 <br />1 <br />23 <br />DEMOLITION PLAN <br />D2.00 <br />1 <br />24 <br />INTERIM TRAFFIC ACCESS KEY PLAN <br />D2.01 <br />3 <br />25 <br />INTERIM TRAFFIC ACCESS PLAN AND PROFILE <br />D2.02 <br />1 <br />26 <br />INTERIM TRAFFIC ACCESS PLAN AND PROFILE <br />D2.03 <br />2 <br />27 <br />INTERIM TRAFFIC ACCESS PLAN AND PROFILE <br />D2.04 <br />1 <br />28 <br />INTERIM TRAFFIC ACCESS PLAN AND PROFILE <br />D2.05 <br />4 <br />29 <br />INTERIM TRAFFIC ACCESS SECTIONS <br />D3.00 <br />1 <br />30 <br />TEMPORARY EROSION AND SEDIMENT CONTROL KEY PLAN <br />D3.01 <br />1 <br />31 <br />TEMPORARY EROSION AND SEDIMENT CONTROL PLAN <br />D3.02 <br />1 <br />32 <br />TEMPORARY EROSION AND SEDIMENT CONTROL PLAN <br />D3.03 <br />1 <br />33 <br />TEMPORARY EROSION AND SEDIMENT CONTROL PLAN <br />D3.04 <br />1 <br />34 <br />TEMPORARY EROSION AND SEDIMENT CONTROL PLAN <br />D3.05 <br />1 <br />35 <br />TEMPORARY EROSION AND SEDIMENT CONTROL PLAN <br />D3.06 <br />1 <br />36 <br />TEMPORARY EROSION AND SEDIMENT CONTROL PLAN <br />D3.07 <br />1 <br />37 <br />TEMPORARY EROSION AND SEDIMENT CONTROL PLAN <br />D4.00 <br />1 <br />38 <br />SURCHARGE KEY PLAN <br />D4.01 <br />1 <br />39 <br />SURCHARGE PLAN AND PROFILE <br />D4.02 <br />1 <br />40 <br />SURCHARGE PLAN AND PROFILE <br />D4.03 <br />1 <br />41 <br />SURCHARGE PLAN AND PROFILE <br />D4.04 <br />1 <br />42 <br />SURCHARGE PLAN AND PROFILE <br />D4.05 <br />1 <br />43 <br />SURCHARGE POINTS TABLE AND DETAILS <br />D5.00 <br />2 <br />44 <br />UTILITY PLAN <br />D5.01 <br />2 <br />45 <br />UTILITY DETAILS <br />D5.02 <br />1 <br />46 <br />UTILITY PLAN <br />0 <br />Y <br />1 THIS DRAWING SET WAS CREATED AS AN ELECTRONIC <br />1 DOCUMENT. IF THE ELECTRONIC DOCUMENT DOES NOT <br />INCLUDE A VERIFIABLE DIGITAL SIGNATURE IN THE BOX <br />a ABOVE, PLEASE CONTACT THE ENGINEER OF RECORD <br />FOR THE ORIGINAL CERTIFIED ELECTRONIC DOCUMENT. <br />SHEETINDEX <br />DWG NO. REV. NO. SHEET NO. I SHEET NAME <br />ELECTRICAL <br />E1.00 <br />1 <br />47 <br />ELECTRICAL SITE PLAN 13TH STREET <br />E2.00 <br />2 <br />48 <br />ELECTRICAL SITE PLAN NORTHWEST & NORTHEAST <br />PROJECT ENGINEER: SCALE: <br />PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY J. KEISER NOTED <br />Port o, f ®7/'/� /23 JBK RECORD DRAWINGS PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE <br />CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. DESIGNED BY : DATE: <br />® ® © 3240-a11.keAv-. 03 0/18/ JBK TAA2 PARKING REVISION 1 WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT, C. WIEST JULY 2022 <br />EVERETT Seante, w.1387 m9aloz THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF <br />2 0/18/ JBK TEMPORARY ACCESS REV 1 DRAWN BY: CHECKED BY <br />2: 206.624.1387 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY <br />ENGINEERS, INC.-pndengjnem.com 01 8/10/22 JBK ADDENDUM 1 AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN G. DEAN C. CASTONA <br />P.O. BOX 538 APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED <br />EVERETT, WA 98206 DO 7/27/22 JBK ISSUED FOR BID IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT APPROVED BY: <br />(425) 259-3164 DIRECTLY OR INDIRECTLY TO PND. <br />N0. DATE BY REVISION <br />RECORD <br />PORT OF EVERETT <br />MILLWRIGHT LOOP ROADS <br />PHASE 1 <br />SHEET INDEX <br />DRAWINGS <br />G 1.01 <br />CIP NO. <br />6-8-008-01 <br />PROJECT N0. PD-WP-2022-07 I <br />SHEET NO. 2 OF 48 <br />