My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 14TH ST 2024-03-01
>
Address Records
>
14TH ST
>
1001
>
1001 14TH ST 2024-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2024 2:31:55 PM
Creation date
2/24/2024 10:01:33 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1001
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
417
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G2.01 _ _ 1 _ _ _ _ _ _ _ _ _ _ _ _ _ 3 IG G2.01 L y111 <br />MATCHLINE I I I I W I MATCHLINE <br />DATUM: I I I I Q = a <br />HORIZONTAL: NAD 83/91 WSPC NORTH ZONE. U.S. SURVEY FEET. <br />CONSTRAINED TO CITY OF EVERETT VALUES. a CD <br />VERTICAL: MEAN LOWER LOW WATER (MLLW). <br />CONSTRAINED TO DEA #3009. <br />(EVT E009) AS BEING 17.083. I I P191 I <br />OTHER VERTICAL NOTES: <br />DEA #3009 MLLW=17.083. x <br />SAME POINT AS PUBLISHED BY CITY OF EVERETT E009=14.78 NAVD88. I I o o <br />DIFFERENCE BETWEEN MLLW AND NAVD 88 IS 2.30' W <br />SO TAKE MLLW AND SUBTRACT 2.30 FEET TO GET TO NAVD88. I I cal 3 \ <br />NOTES: n <br />ICI <br />1. TOPOGRAPHIC SURVEY FROM DEA 2015 PROJECT SURVEY. I <br />2. PORTIONS OF THIS PROJECT SURVEY ARE INCOMPLETE AND/OR NO N EL�44.78 <br />LONGER REPRESENTATIVE OF THE EXISTING SITE CONDITIONS. <br />3. CONDITIONS DEPICTED ON THE FOLLOWING SHEETS AREA I x EL. 3s.1s <br />COMBINATION OF THE FOLLOWING SOURCES: <br />3.1. 2015 DEA PROJECT SURVEY G�p°� ") 3( x <br />EM EL 45.25 P 1 S <br />3.2. DRAWINGS FISHERMAN'S HARBOR UPLAND INFRASTRUCTURE DESIGN <br />3.3. SE MILLWRIGHT LOOP AND OPEN SPACES DESIGN DRAWINGS <br />3.4. SITE INVESTIGATION. 5 SER�� XE ME� 4 X EL 42.37 x <br />OONN 6 3 44.00 <br />I o x x x- <br />�.� ggMM 1155 / W <br />p -"VC �5 PSQNP �OP1H3.6.8 I3 I I �/ GRPVE� it � <br />cso - VC cso 1 1 cso cso w I ,'cso <br />PS° I S IBL <br />so so�c^so so so WV <br />G G c c G c c c c 6 G <br />° Nc I <br />�� 5 g <br />6 P S P �' IE P31�5-38"'PVC (S� � <br />LIGHT EL. 43.74 I <br />EL. 39.52 0 16 <br />c{Q NEL. 53.44 I I EX <br />,� P I\ EL 4B.54 <br />EL. 48.95 <br />EL. 45.65 EL 53.48 <br />EL 5170 EL EL651.73 EL. 48.26 EL. 48.87 El. 49.06 El. 53.39 I <br />55 ss ss ��s ss 55 ss S 5 5 - GE s 5s - OE s5 ss <br />SSMM EL. 51.89 -OE -OE - -0E- -0 E - OEOESSEOE- <br />a �P)5 58 -�-SS-CE- - -OF- - -°E - -0E- - _ - of - x _ x x- <br />° FFF _ L 12.4 - - OE - - - 0 - OE - -0E- OE - - DE - - 0 OE <br />5D EL. 52.07 - OE - E p H 0 <br />LD EL 53.59 <br />EL. 49.00 <br />x x x fi CLF x x x x xx CLF xx xx- EL 51s3 L. 48.os <br />EL. 53.56 DEL. 53.47� P. 1rj <br />EL. 48.87 / EL. 41.17 g 4 <br />EL. 52.23 EL. 51.82 EL. -53.32 I 1D. \ ,ESN <br />5 5 O <br />wV <br />z I 12-48,PVC (N,E) Q w w w w w �w w 20' DIA DRIPLINE <br />w ww w <br />o I 8" DEC. TREE <br />/ LIGHT EL 39.55 <br />Y <br />i tp' DID I INE EP CC�gg cp <br />6 DE () FUEL V x <br />} 16 <br />Y Y N \0 - a x SD <br />O J O _� W E 7 <br />ppIIqq pp®��ppLLIINNI-(W) x� <br />CEDARRTREE W <br />l LO <br />0 6 N TOP LIGHT POLE <br />B VENT EL. 39.23 <br />o TOP LI T P E CCCW �ULT <br />VAo�ER <br />E5 FUEL <br />L. 38.5 <br />w <br />y I Z <br />y I p U � CV <br />Q C° <br />x MATCHLINE _ <br />1 G2.03 <br />PLAN <br />a <br />n SCALE IN FEET <br />IF THIS DRAWING IS NOT 22"x34" SCALE ACCORDINGLY. 20 0 20 40 RECORD DRAWINGS <br />N <br />PROJECT ENGINEER: sGPORT OF EVERETT DWG. No. <br />PND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY J. KESER NOTED G2.02 <br />PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE <br />z CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. DESIGNED BY: DATE: <br />y Port O� 3140 a"slake A�er,�eE WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT, C. WIEST JULY 2022 MILLWRIGHT LOOP ROADS CIP N0. <br />® ® ® Seam,,wastwm-98102 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF �" q 6-8-008-01 <br />EVERETT p: 206.624.1387 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY DRAWN BY CHECKED BY PHASE 1 <br />ENGINEERS, INC.-.pnd-g)nee�s _ Q 7/7/23 JBK RECORD DRAWINGS AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN G. DEAN C. CASTONA PROJECT <br />ti P.O. BOX 538 APPROVAL FROM FIND. DRAWINGS ARE ALSO NOT TO BE USED NO. PD-WP-2022-07 <br />EVERETT, WA 98206 QO 7/27/22 JBK ISSUED FOR BID IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT APPROVED BY: SITE TOPOGRAPHIC SURVEY <br />(425) 259-3164 DIRECTLY OR INDIRECTLY TO FIND.N0. DATE BY REVISION SHEEP N0. 9 OF 48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.