Laserfiche WebLink
X <br />UTI <br />3x, <br />I I <br />✓ M <br />I I I <br />I I <br />I I <br />I <br />I <br />I I <br />4 4 <br />•4- - <br />OH_LTG <br />I� <br />T 4"C. P o °� <br />M ° 3-2"C. TEL/CBL/GRD <br />0 2-1 "C. COM <br />° 2-0.75"C. P/LTG <br />0 0 0 <br />\ MDB ,SOUTH) 600A <br />480/277-240/120V, 30, <br />WEYERHAEUSER V A A <br />BUILDING (EXISTING) <br />L---- P.+LTG � \\ <br />MATCHLINE +125'-0" <br />-------JL- - - - - --- <br />I I a <br />< <br />O f <br />I <br />VV � <br />I <br />I <br />I <br />2 C. P (50A,120/24OV)�I <br />p <br />I I <br />I <br />II I I <br />I I <br />I I I I x <br />I I I <br />I I / <br />I I I( <br />2"C. P (60A,120/24OVI <br />e <br />� I <br />X <br />,00A, ,zo/zaov, <br />y 10 METER/MAIN �e <br />PANEL I /x <br />X_ _ <br />n � � RP X� � <br />Port o, f � I I 3240 Eastlake Avenue E <br />J EVERETT Seattle, Wa'hi24.138 gxon 98102 Q <br />LM P: 20G.G24.1387 <br />ENGINEERS, INC. _.Pndengine com Al <br />v P.O. BOX 538 Q <br />EVERETT, WA 98206 <br />(425) 259-3164 <br />No. <br />x <br />RECORD DRAWINGS <br />10/22 EJD ADDENDUM #1 <br />27/22 EJD ISSUED FOR BID <br />DATE BY REVISION <br />0 <br />.2 <br />A <br />FIND ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY <br />PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE <br />CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. <br />WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT, <br />THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF <br />INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY <br />AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN <br />APPROVAL FROM PND. DRAWINGS ARE ALSO NOT TO BE USED <br />IN ANY MANNER THAT WOULD CONSTITUTE A DETRIMENT <br />DIRECTLY OR INDIRECTLY TO PND. <br />OH LTG <br />ELECTRICAL SITE PLAN — NORTHWEST <br />SCALE IN FEET <br />20 0 20 40 <br />0 <br />ELECTRICAL SITE PLAN — NORTHEAST <br />SCALE IN FEET <br />20 0 20 40 <br />PROJECT ENGINEER: <br />SCALE: <br />E. DAVID <br />NOTED <br />DESIGNED BY: <br />DATE: <br />E. DAVID <br />JULY 2022 <br />DRAWN BY: <br />J. CAMPBELL <br />CHECKED BY- <br />E. DAVID <br />APPROVED BY: <br />N, RECORD DRAWINGS <br />PORT OF EVERETT DWG. No. E2.00 <br />MILLWRIGHT LOOP ROADS CIP NO. <br />PHASE 1 6—$-008-01 <br />ELECTRICAL SITE PLAN PROJECT <br />No. PD—WP-2022-07 <br />NORTHWEST & NORTHEAST SHEET NO. 48 OF 48 <br />