Laserfiche WebLink
DATUM: <br />HORIZONTAL: NAD 83/91 WSPC NORTH ZONE. U.S. SURVEY FEET. <br />CONSTRAINED TO CITY OF EVERETT VALUES. <br />VERTICAL: MEAN LOWER LOW WATER (MLLW). <br />CONSTRAINED TO DEA #3009. <br />(EVT E009) AS BEING 17.083. I <br />OTHER VERTICAL NOTES: <br />DEA #3009 MLLW=17.083. <br />SAME POINT AS PUBLISHED BY CITY OF EVERETT E009=14.78 NAVD88. <br />DIFFERENCE BETWEEN MLLW AND NAVD 88 IS 2.30' <br />SO TAKE MLLW AND SUBTRACT 2.30 FEET TO GET TO NAVD88. <br />NOTES: <br />1. TOPOGRAPHIC SURVEY FROM DEA 2015 PROJECT SURVEY. <br />2. PORTIONS OF THIS PROJECT SURVEY ARE INCOMPLETE AND/OR NO <br />LONGER REPRESENTATIVE OF THE EXISTING SITE CONDITIONS. <br />3. CONDITIONS DEPICTED ON THE FOLLOWING SHEETS ARE A <br />COMBINATION OF THE FOLLOWING SOURCES: <br />3.1. 2015 DEA PROJECT SURVEY <br />3.2. FISHERMAN'S HARBOR UPLAND INFRASTRUCTURE DESIGN <br />DRAWINGS <br />3.3. SE MILLWRIGHT LOOP AND OPEN SPACES DESIGN DRAWINGS <br />3.4. SITE INVESTIGATION. <br />E <br />o �� <br />o <br />" <br />°o,��� a �`` <br />P1728�.6a4 vc SE <br />J, • 3„ � � 17.6-8"CPP �SW�W) <br />I MATCHLINE <br />F� <br />MATCHLINE <br />G2.08 <br />a <br />PLAN <br />D <br />SCALE IN FEET <br />N <br />Y IF THIS DRAWING IS NOT 22"x34" SCALE ACCORDINGLY. <br />20 0 20 <br />40 <br />PROJECT ENGINEER: <br />SCALE: <br />PORT OF EVERETT <br />DWG. NO. <br />oHIND <br />ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY <br />PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE <br />BRUCF <br />J. KEISER <br />NOTED <br />G2.07 <br />N %% <br />PortV <br />,� ewesx <br />. ° i <br />DESIGNED BY: <br />DATE: <br />e¢.1 <br />v <br />® ® ® <br />3240 Eastlake A,,m, E <br />Setde,W.shmgNP98102 <br />CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. <br />WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT, <br />�P <br />$ �P <br />C. WIEST <br />JULY 2022 <br />MILLWRIGHT LOOP <br />ROADS <br />CIP N0. <br />6-8-008-01 <br />EVER TT <br />THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF <br />INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY <br />DRAWN BY: <br />CHECKED BY: <br />1 <br />PHASE 1 <br />n <br />P.O. BOX 538 <br />ENGINEERS, INC. <br />P:206.624.1387 <br />www.pndengioeees.mm <br />AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN <br />FROM PND.ALSONOT TO BE USED <br />, vF 32789QEo �� <br />FSSAONAE <br />G. DEAN <br />C. CASTONA <br />SITE TOPOGRAPHIC <br />SURVEY <br />PROJECT <br />NO. PD-WP-2022-07 <br />N EVERETT, WA 98206 <br />QO <br />7/27/22 <br />JBK <br />ISSUED FOR BID <br />NAPPROVAL <br />THAT WOULD CONSTITUTE <br />ECVG\ <br />APPROVED BY: <br />I. (425) 259-3164 <br />DATE <br />BY <br />REVISION <br />DIRECTLY OR INDIRECTLY TO HIND.ND. <br />8/� <br />SHEET N0. 14 OF 48 <br />