CITY OF EVERETT <br /> STANDARD PLAN NOTES <br /> Required Notes for Erosion/Sedimentation Control Plans <br /> The following standard notes shall be added to construction plan sets and edited as Required Notes for Water Plans <br /> appropriate to the project. A. No connection to the existing mains will be allowed except by means of an <br /> 1. Approval of this erosion/sedimentation control(ESC)plan does not constitute approved backflow prevention device prior to satisfactory flushing,testing, <br /> an approval of permanent road or drainage design(e.g.size and location of roads, disinfection,and receipt of satisfactory bacteriological test results. <br /> pipes,restrictors,channels,retention facilities,utilities). B. Connections to and taps on existing mains will be made by the Public Works <br /> 2. The implementation of these ESC plans and the construction,maintenance, Department at the developer's expense.The Public Works Department shall be <br /> replacement,and upgrading of these ESC facilities is the responsibility of the given at least 5 business days notice for each connection.The Public Works <br /> applicant/contractor until all construction is completed and approved and Department shall thereafter determine the date and time at which the connection <br /> vegetation/landscaping is established. shall be made. <br /> 3. The boundaries of the clearing limits shown on this plan shall be clearly C. All work and materials must conform to City of Everett Standards. <br /> flagged in the field prior to construction.During the construction period,no D. A pre-construction meeting shall be held with the City prior to the start of <br /> disturbance beyond the flagged clearing limits shall be permitted.The flagging shall construction.The City of Everett Public Works Construction Division must be <br /> be maintained by the applicant/contractor for the duration of construction. notified at least 24 hours prior to commencement of construction. <br /> 4. The ESC facilities shown on this plan must be constructed in conjunction E. The developer or the developer's authorized agent shall notify the Public <br /> with all clearing and grading activities,and in such a manner as to ensure that Works Department of a person who can be contacted regarding problems during <br /> sediment and sediment laden water do not enter the drainage system,roadways,or construction on a 24 hour basis. h,a. E> <br /> violate applicable water quality standards. F. Maintain a minimum of 10 feet horizontal and 18 inches vertical separation <br /> P,lik � Everett Ave <br /> 5. The ESC facilities shown on this plan are the minimum requirements for m�aana <br /> between potable and non-potable conveyance systems. <br /> anticipated site conditions.During the construction period,these ESC facilities shall H—MIJ H111P„MQVe Bilk Park <br /> be upgraded as needed for unexpected storm events and to ensure that sediment and G. All City of Everett valves shall be operated by Public Works Department <br /> sediment-laden water do not leave the site. personnel only.All valves,new and existing,shall be accessible at all times. s Padn,A- <br /> 6. The ESC facilities shall be inspected routinely and maintained by the / <br /> Required Notes for Sanitary Sewer Plans <br /> applicant/contractor to ensure their continued functioning,especially after storm P ke <br /> The following standard notes are required on all Sanitary Sewer Plans: Hi u Park <br /> events. A. All work and materials shall conform to the City of Everett Standards and j <br /> 7. The ESC facilities on inactive sites shall be inspected and maintained a asm St <br /> minimum of once a month or within the 48 hours following a major storm event. WSDOT/APWA Standard Specifications. KIw Nn Park <br /> 8. At no time shall more than one foot of sediment be allowed to accumulate B. No part of the sanitary sewer system shall be covered,concealed or put into j <br /> within a trapped catch basin.All catch basins and conveyance lines shall be cleaned use until it has been tested,inspected,and approved by the city inspector. • '( <br /> prior to paving.The cleaning operation shall not flush sediment laden water into the C. Approximate locations of existing utilities have been obtained from available ` Gateway No s i <br /> downstream system. records and are shown for convenience.The contractor shall be responsible for <br /> 9. Stabilized construction entrances shall be installed at the beginning of <br /> verification of locations and to avoid damage to any additional utilities not shown. H--th Pad 410 s <br /> If conflicts with existing utilities arise during construction,the contractor shall �,wueo 81” <br /> construction and maintained for the duration of the project.Additional measuresa <br /> notify the public works inspector and any changes required shall be approved by thePi <br /> maybe required to ensure that all paved areas are kept clean for the duration of the PmestPark v n i <br /> City Engineer prior to commencement of related construction on the project. , t <br /> project e Contractor shall provide periodic street cleaning to remove debris and 1) D.All sewer main extensions within the public right-of-way or in casements scret a J! <br /> sediment tracked off the site. must be staked by survey for line and grade prior to starting construction. Pak ­11 F„„ 1 <br /> c Johnston <br /> 11. Appropriate measures shall be taken to stop sediment from entering surface Sample Construction Sequence: kKairy Park ' <br /> water bodies if the proposed BMPs fail. 1) Call for any utility locates at least two days prior to scheduled preconstruction <br /> 12. Bare and/or disturbed soils shall remain uncovered and/or unstabilized for no meeting. o ` <br /> more than 2 days from October 1 through April 30,and for no more than 7 days 2) Before any construction or development activity,a preconstruction meeting must be <br /> from May 1 through September 30. held between the City of Everett,the applicant and applicant's construction representative. <br /> 3) Flag clearing limits. VICINITY MAP <br /> Required Notes for Storm Drainage Plans 4) Install stabilized construction entrance. 111=2000' <br /> 1. No part of the drainage system shall be covered,concealed,or put into use 5) Install filter fabric fence as indicated on plan. <br /> until it has been inspected,tested,and accepted by the City of Everett. 6) Install offsite catch basin protection. LEGAL DESCRIPTION <br /> 2. All work and material shall conform to the City of Everett Design and 7) Construct sediment trap/pond if applicable. ALL THAT PORTION OF THE NORTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION 30,TOWNSHIP 29 NORTH,RANGE 5 EAST,W.M.,IN SNOHOMISH <br /> Construction Standards and Specifications and the WSDOT/APWA Standard 8) Clear and grub areas of the site to be rough graded or filled. COUNTY,WASHINGTON,DESCRIBED AS FOLLOWS: <br /> /b <br /> l <br /> t <br /> ll interceptor swaeserms and check dams if applicable. <br /> Specifications for Road,Bridge,and Municipal Construction(Current Edition). 9) BEGINNING AT THE POINT 60 FEET SOUTH OF THE SOUTHEAST CORNER OF LOT 17,BLOCK 12,FRIDAY'S FIRST ADDITION TO EVERETT,ACCORDING TO THE <br /> 3. Approximate locations of existing utilities have been obtained from available 10) Rough grade site and install storm conveyance system and retention/detention PLAT THEREOF RECORDED IN VOLUMES OF PLATS,PACE 34,RECORDS OFSNOHOMISH COUNTY,WASHINGTON; <br /> pp g THENCE SOUTH AND PARALLEL WITH THE WEST LINE OF HOW AVENUE 185 FEET TO THE TRUE POINT OF BEGINNING; <br /> records and are shown for convenience.The contractor shall be responsible for facilities. Provide inlet protection where indicated. THENCE WEST 128.31 FEET; <br /> pTHENCE SOUTH 55 FEET; <br /> verification of locations and to avoid damage to any additional utilities shown.If 11) Install remaining utilities and building. <br /> TnencE EAST 128.31 FEET; <br /> 12) Finish grade site and construct asphalt parking areas,access drives,sidewalks,curbs THENCE NORTH 55 FEET ALONG THE WEST LINE OF SAID HOW AVENUE TO THE TRUE POINT OF BEGINNING; <br /> conflicts with existing utilities arise during construction,the contractor shall notify <br /> and gutters. <br /> Bw <br /> the Public Works Inspector and any changes required shall be approved by the City (BEING WHAT urns FORMERLY KNOWN AS LOT z4 AND 25 AND THE NORTH 5 FEET of LOT z3,BLOCK 23,FRIDAY'S FIRST ADDITION To EVERETT>. <br /> 13) Complete site stabilization in accordance with landscape plans. <br /> Engineer prior to commencement of related construction on the project. 14) Clean storm drainage system,on and off site,of all sediment and debris. <br /> 4. All storm systems within the public right-of-way or in easements must be 15) Remove temporary erosion control facilities when site is completely stabilized. <br /> staked by survey for line and grade prior to starting construction. TABLE OF CONTENTS <br /> 5. All catch basin grates must be stenciled or stamped"Dump No Waste,Drains <br /> to Stream,Lake,River,Puget Sound,or Wetland.”Choose appropriate feature for CI COVER SHEET/NOTES <br /> the project. C2 TESC/DEMO/CSWPPP <br /> C3 TESC DETAILS <br /> C4 UTILITY SITE PLAN <br /> C5 UTILITY DETAILS <br /> Six Gill 12 Pact - JRevisions: <br /> — <br /> .0 h, <br /> Site Address:3718 Hoyt Ave ��t aew^s��N�2 <br /> aC <br /> Know what's below. Jurisdiction:Everett ae <br /> Call 811 before you dig. Parcel No.:290S3000401400 Interlaken Engineering and Design, PLLC q 55,63 <br /> Applicant: Six Gill LLC Seattle,WA 1 (206)470-9572 90 SIONALENCover Sheet <br /> Permit No.: Scale:As Noted <br /> Interlaken Project No.:SEA-21-146 www.interakenengineering.com <br />